to win a dynamic and challenging post in a big organization. This post should take full advantage of my previous experiences, including my communication abilities.
Professional Experience
From March 15, 1997 - Present Company: Integrated Drilling Services Limited EGYPT (IDSE). Position: Maintenance Supervisor in addition to the IT activities responsibilities. Responsibilities: "Supervise all the maintenance activities at the MWD Workshop including Complete overhauling of MWD pulser. "Ensure timely dispatch of all equipment / spares "Responsible fir IDS warehouse.. "Supervise and assist in the loading / unloading of MWD kits. "Ensure applying company's QA and HSE policy. "Help in Preparing Budget for maintenance / operations for every project / contract. "Responsible for IDSE Database. "Improving performance of MWD tools by applying best maintenance techniques with maximum productivity / availability and optimum cost reduction for drilling equipment. "Participate in Preparing tenders documents as required for local and overseas including daily / monthly operating cost, maintenance cost, administration cost, profit Margin, maintenance records, activity history, company Brochures, ?Ketc "Responsible for IT activities including Software and Hardware installation / maintenance. "Participate in preparing the annual Financial Statements using PEACHTREE Accounting / Inventory software 2) From Dec 91 to March 97
Company : Gulf Of Suez Petroleum Co. "GUPCO - BP (AMOCO)" Position : Turbines Operation & Maintenance Supervisor Responsibilities: " Operation & maintenance of Industrial gas turbines "ALLISON Gas Turbines Type KC & KC5". " Prepare & issue the business plan concerning optimizing down time, availability, cost, major jobs and overhauls for the next years. " Co-ordinate with other departments and Barge for major project using MS Project Management. " Supervise the implementation of preventive & predictive maintenance according to plan to decrease down times due to shut downs, waiting materials. " Supervise the implementation of GUPCO HSE policy. " Inspection & replacing of the engine, power turbine & hot section. Tear down & inspection of the turbine hot section. " Operation, maintenance & overhauling I-R centrifugal gas compressors. " Alignment of the gas compressor, power turbine and gear box. " Operation of the whole p/f (including generators, pumps, air compressors .....). " Using MAXIMO Software for every job performed. " Calibration for monitors, modules, switches & control panel.
Eductation
„X B.Sc. Mechanical Engineering (Mech. Design & Prod. Dept.) Faculty of Engineering, CAIRO University - May 1991 Grade : Good Project : Design & Manufacturing a mechanical cultivator using AutoCAD and AutoLisp Project Degree : Distinction
„X Secondary Graduation : G.C.E. ( From The British Council In Cairo) - 1986
Certification
Training Courses:
Technical:
1) Transmitter (MWD Pulser) maintenance @ GEOLINK CO- SCOTLAND, UK. 2) Maintenance training @ IDS workshop.- SCOTLAND, UK. 3) Vibration monitoring & analysis (American University in Cairo.) 4) Vibration analysis ( GUPCO vibration sector @ R/Sh ) 5) Alignment & balancing ( Natcom Co. R/Sh ) 6) Microprocessors in control system & instrumentation 7) Complementary maintenance systems. (Arac Center, Cairo) 8) Hydraulic circuits & controls ?V GUPCO. 9) Electrical & electronic training (R/Sh) ?V GUPCO. 10) Anti Surge system & controls ?V GUPCO.