José Luis Gutier Serrano C/ Pepe la Mata, 10, 3º, C 33430 Candás Asturias Spain Born 19/12/1957 Telephone : +34-985-884458 Mobil: 690-861877 jlgutier@telefonica.net
Formation :
FP.:Formation Professional School ( Production and Industrial Mechanical Construction ) Autocad : V10, V12, V14, 2000, 2004 Certificate : Prevention Labor Risks ( Level Basic 30 Hours + Module of Contruction 20 Hours ) Certificate: Deck Rating , No.4354 Regulation: II/4 Certificate: Survival Certificate: STCW VI/1 Revalidation: 28/01/2008 Certificate: Advanced Fire Fighting Revalidation: 28/01/2008 English : Medium Level
Ref. Rig Welder/ Boiler
Experience : From 1983 to 1989
Offshore Drilling : Roustabout; Rig Welder Ocean Voyager, Ocean Kokuei, Ocean Liberator, Ocean King, Sedco H, South Seas Driller
Ref. Supervisor Construction Ref. Inspector Construction
Other Excellent Experiences: From 1990 to 2007
Felguera I.H.I. : Delegate, ( Delegation Islands Canarias ) Felguera I.H.I.: Field Engineer Execution Project Leader.- Construction Tanks Storage Oil Products. Spheres & Tanks, Corp. : Field Engineer Execution Project Leader .- Construction Tanks Storage Oil Products. Babcock Assemblies : Boss of mechanical assemblies and welding works .- Assembly Pipe Lines. Tamoin : Boss of mechanical assemblies and welding works .- Assembly Pipe Lines. Noain : Boss of mechanical assemblies and welding works .- Assembly Pipe Lines. Felguera I.H.I.; Tamoin; Moncobra; Sodes; Spheres & Tanks : group Boss .-Construction Tanks Storage Oil Products, Assembly Pipe Lines, Metallic Structures, Equipment for Construction. Felguera Heavy Fabrication Workshop, Felguera Assemblies, Sodes, Imasa, Mefasa, Ticsa, Archanda Assemblies. Boilermaker-pipe .-Production and Assembly of Pipe Lines, Metallic Structures, Equipment for Construction. Mefasa : Technician of technical office (( MTO of Drawings and Calculation of Times ( Scheme, Assembly and Welding for Tenders)).
Last Work:
Felguera IHI : Representative and Advice ( Project NC 115 ) LIBYA, From 11/12/05 to 20/05/06 Felguera IHI : Boss welding works ( Responsible Execution of Welding Works ) From 01/06/06 to 21/09/06
Sincerily,
José Luis Gutier
|