Benefit From My Skills.
Improve Myself.
Gain Knowledge and Experience.
Earn Money.
Looking for the best.
Professional Experience
*job description: Electrical site engineer at the oil field in the projects department in a Petroleum Company. *aware by: -Cathodic protection system. -Distribution and power transformers. -Power electrical cables calculations. (Voltage drop-cables sizing). -Power cables tests (insulation and resistance). -Load study calculations. -Substations consist of switchgear system with a synchronization standby source (generator). -Earthing systems. -Motor starting methods. -Preventive maintenance for electrical generators. -Drawing SLD for electrical networks using AutoCAD. - Prepare history cards for electrical equipments. -Tenders technical evaluation procedures.
Eductation
University: Higher Technological Institute at 10th of Ramadan City (H.T.I.) Department: Electrical Engineering B.Sc.: Electrical Engineering, Augast 2004 Graduation Project: Production Line Application (Control System) Project Grade: Excellent Year of Graduation: 2004
Certification
*Power protection system course in Enppi.
*Programming logic controller (PLC) course in Enppi.
*Induction Motors (selection-operation-maintenance) in Petromaint.
*Hazards area classification course in Alexandria University.
*Communication and job hazard analysis course in Egyptian Training Center (ETC).
Additional Information
*jobs had been attended: -Commissioning and start-up of (liestritz) screw pumps with (weg) motors equipped with a variable speed drive (VSD) at ESHPETCO site. - Installation, commissioning and start-up of switchgear system consist of several phases of voltage (low-medium) and synchronizing with CATERPILLAR GENSET achieved by ABB and Schneider companies at ESHPETCO site. -Commissioning and start-up of ESHPETCO pipeline and water injection tank cathodic protection system. -Commissioning and start-up of a desalination unit with a reverse osmosis technique controlled by a PLC system. -Assembling, commissioning and start-up of ESP oil artificial lift system consists of either VSD or SB technique. -Commissioning and start-up of a fiscal meter skid as a fluid measuring system supplied and commissioned by EMERSON Daniel measurement and control. (Measurement and Calibration). -Design, construction and installation buildings power distribution (lighting- normal sockets-power sockets-air conditions-three phase) with calculations and drawings for five buildings.