Gulf Oil and Gas accountACCOUNT

Senior Planning Engineer

This is a candidate registered on To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 11 years
Relocation: Yes - Internationally

Industry Experience
10 years Project Engineer

Career Objective

Seeking an employment in the field of engineering, where by my academic background, experience and interpersonal skills can be applied and further developed.

Professional Experience

KHALDA PETROLEUM CO. March 2004 - Present
New Maadi - Cairo - Egypt
Projects General Department, Khalda Petroleum Co., Maadi, Cairo, Egypt.

Planning Engineer

General Description:
-Responsible for the supervision, review and recommendations to Management of the established Project Schedule.
-Responsible for the management and maintenance of the Project Schedule during the execution of the Project.
-Provide the regular Progress Reports to the PMT.

Tasks & Responsibilities:
-Manage the "Build" of the Project Schedule, its review for final approval by Management.
-Take custody of the complete Project Schedule and maintain it during the execution of the Project.
-Re-baseline / modify the Project Schedule as the course of events dictate.
-Establish a focal presence and a Reporting System for updates from Contractors and Suppliers of periodic progress and use to prepare Management Reports.
-Analyze the regular reports and highlight to Management concerns that could influence the completion of the overall Project.

1.Prepare CPM charts using Primavera.
2.Create "S" Curves and control sheets.
3.Set standard formats for reporting.
4.Receive reports from contractors and evaluate them.
5.Identify the critical activities and advise the project team.
6.Attend the weekly and monthly review meetings.
7.Liaise between the materials department and site construction.
8.Coordinate between the engineering consultant and different project disciplines.
9.Follow-up the different manufactures reports, define the delays and highlight them.
10.Issue the weekly and monthly reports.
11.Conduct site visits to survey progress.
12.Prepare Progress Review Presentations to the senior and top management.

SAUDI AIRCON February 2002 - February 2004
Eastern Province - Khobar - Saudi Arabia
Planning Engineer (Feb. 02 - Jan. 03) / Project Manager (Jan. 03 Feb. 04)

KHALDA PETROLEUM CO. January 2001 - February 2002
New Maadi - Cairo - Egypt
Project Engineer

KHALDA PETROLEUM CO. February 1998 - April 2000
New Maadi - Cairo - Egypt
Project Engineer


Faculty Of Engineering, Cairo University
One preparatory year for the M. Sc. degree
Materials Science (courses in: failure analysis, testing of materials, physical metallurgy and welding) May 1999 - May 2000

Higher Technological Institute
August 1996
Tenth of Ramadan City, Egypt
Very Good with Honor Degree - May 1996 - (Global GPA is 3.2 out of 4)
Degree: B.Sc. - Mechanical Engineering
Thermal engineering
Internal combustion
Renewable energy
Turbo machines
Oil storage tanks design

Holy Family School (Collage de la Sainte Famille) June 1990
Pre-University education (Primary, Prep., Secondary), Cairo, Egypt
Degree: High school


Egypt Engineers Syndicate, No. 5120/36, September 1996
International Project Management Association, IPMA No. DEG-174, April 2005

Additional Information

Training Courses / College Summer Programs

- Comprehensive welding course leading to become a certified Radiographic Testing Examiner Level (II).
Cairo, Egypt
From 18/4/99 to 29/4/99

- Valve Selection, Installation, and Maintenance.
Cairo, Egypt
From 27/11/99 to 02/12/99

- Planning and Scheduling with Primavera Project Planner.
Cairo, Egypt
From 16/1/2000 to 01/2/2000

- A/C applications and design, Al-Zamil Factory.
Khobar, Saudi Arabia
From 10/1/2003 to 20/1/2003

- Load Analysis Calculation, Carrier.
Khobar, Saudi Arabia
One Full Day

- Project Management Methodology & Techniques (IPMA Preparation Course), American University in Cairo (AUC).
Cairo, Egypt
From 8/2/2005 to 9/4/2005

- Planning & Controlling with Primavera Enterprise.
Cairo, Egypt
From 23/7/2006 to 27/7/2006

- Primavera Enterprise - Advanced Topics.
Cairo, Egypt
From 13/8/2006 to 17/8/2006

- Oil storage tanks design according to API 650 / Pressure Vessels according to BS 5000 (summer 1995), from 02/6/95 to 30/9/95.
Lisbon, Portugal
Introduced to the followings:
1. Welding symbols (ISO, A.W.S., DIN) and weld design.
2. Materials.
3. Design of storage tanks (API STD 650).
4. Design of pressure vessels (BS 5500).
5. Quality assurance based design for welded construction.

Hot Categories

Oil Treating & Refining Petrochemicals Ball valves Gate Valves Butterfly Valves Gas Processing Natural Gas Blowers Control Valves Fire Hydrant Oil & Gas Companies Exploration Transport of Hydrocarbons Production Ecological & Environmental Oil and Gas Pipeline Oil Field Services

Are you Hiring?

Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search
400-Project Management Consultants  News Design/construction/Engineering Graphics  News Engineering  News Engineering Services  News Production Engineering  News Project & Resource Management  News Training & Education  News
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Electrical Engineer

Field Service Technician
Information Systems/Technology
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer

Customer Service
Process Engineer
Control Engineer
Project Manager
Computer Systems Analyst
Engineering Management
Operations Manager
Marketing/Sales Manager
Construction Technician
Plant Engineer
Consulting Engineer
Maintenance Manager
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Privacy Policy.