French company RPS Mars 2007 still working. Gas and oil Site Engineer. Project CCTV access control, industrial Park Arzew. • Engineering: • Realization:
German bureau consuting IGIP Assistant leader of mission. Project of realization of a water-treatment plant
BLACK and VEATCH from June 2005 March 2006. Civil and building work inspector. Desalinated sea water and power unit Arzew.
PIZZAROTTI company from January 2005 – June 2005. Technical head Realization of the western exchanger of Oran.
JAPANESE COMPAGNY IHI 2004-2005. Realization of the station of desalination and electric unit of Arzew.
National office of the studies and rural development BNEDER 2000 – 2004. the Word Bank BIRD.
Engineering and design department ORGEMED 1999 – 2000. Technical assessment and expertise on the buildings of industrial use.
Company BENMOHRA 1992 – 1999. Realization of buildings with use dwelling.