to size equipment,pipe lines, valves and other fittings in oil and gas industries.
Professional Experience
EXPERIENCE SUMMARY
Total of thirteen (13) years of post-graduation experience but over six (6) years in oil & gas industries working with multi-disciplinary design and fabrication teams for major oil & gas projects. Possesses in-depth knowledge and analysis of oil & gas processing principles and capable of execution of both independent and team assignments. Key activities include: ƒæ Preparation of Process Block Diagrams and Process Flow Diagrams ƒæ Preparation of heat and material balances tables from HYSYS, PIPEPHASE or PRO/II simulations ƒæ Preparation of process technical analytical studies and technical note reports ƒæ Sizing and specification of process equipment, such as separators, pumps, compressors, heat exchangers, columns, storage tanks, etc. using HYSYS, PRO/II, Pipephase and PIPESIM. ƒæ Utility design and preparation of Utility Flow Diagrams using HYSYS, PRO/II, Pipephase and PIPESIM. ƒæ Interpretation of Piping and Instrument Diagrams (P & ID¡¦ s) as part of plant¡¦s fabrication team ƒæ Line & Valve Sizing using HYSYS, PRO/II, Pipephase and PIPESIM and preparation of Valve List and Line Description Table (LDT) ƒæ Preliminary design including sizing of major equipment for a proposed Bitumen Storage Tank and truck-loading facilities at Tin Can Port, Apapa ƒæ Design of PMS/AGO storage tanks, loading pumps and power-generating set.
Eductation
DETAILS OF EDUCATIONAL BACKGROUND INSTITUTION CERT. OBTAINED CLASS PERIOD UNIVERSITY OF LAGOS. MSc (in view) 2007 NIGERIAN INSTITUTE OF MGT. NIM (in view) 2008 UNIVERSITY OF LAGOS, BSc (Hons) 2ND CLASS LOWER 1988-94 AKOKA-LAGOS. OGBAA COMM. GRAM. SCHL, IWO. WASSCE 9 PAPERS PASSED 1981-86
Additional Information
WORK HISTORY WITH CRESTVILLE / CRESTECH (SINCE OCT. 2007)
Process Engineer OCT. ¡¦07 - DATE CHEVRON NIGERIA LIMITED (CNL) ¡V ESCRAVOS GAS PROJECT Phase 3B ¡V FEED consisting of sizing and rebuilding the existing compressors to compress the associated gas at Abiteye, Dibi and Olero Production Platforms and inject it in the 12¡¦¡¦ pipeline to Escravos Terminal. It includes verification of the existing compressor package equipment and other necessary modifications needed to meet design requirements. Responsible for the preparation of Line List, Valve List and Equipment List at Olero Production Platform. Also, responsible for the sizing of pipes, valves and equipment. CHEVRON NIGERIA LIMITED (CNL) ¡V ESCRAVOS GAS PROJECT Phase 3B ¡VDETAILED DESIGN for a new gas gathering and compression platform (GGCP) including jacket, deck and topsides and modifications to six existing production platforms, (Abiteye, Dibi, Olero, Opuekeba, Makaraba and Utonana) as required to gather gas currently being flared from those platforms.