Power Plant at 4 x 34 MW coal fired & Diesel Plant 9 x 5 MW with an additional Black Start 1 MW Diesel engine generator. Control and maintain water, steam plant and campus piping distribution system to improve efficiency and reliability.
Professional Experience
1 Manage/monitor Occupation Health and safety 2 Solve operation problems, follow SOP’s (Standard Operating Procedures) 3 Apply quality system to work 4 Operate and monitor communication systems 5 Conduct Isolation Procedures for permit to work 6 Operate and monitor fixed fire protection systems 7 Operate and monitor Compressed Air System 8 Operate and monitor Oil System 9 Operate and monitor Cooling system 10 Operate and monitor Boiler draught System 11 Operate and monitor Boiler Steam/ Water Cycle 12 Operate and monitor AC Electrical System within a Power Station 13 Operate and monitor DC Electrical System within a Power Station 14 Operate and Monitor H.V Primary Switchgear 15 Operate and Monitor H.V Secondary Switchgear 16 Operate and monitor Water treatment plant 17 Operate and monitor water Quality control system 18 Plan Organize Work 19 Interpreted technical drawings in the form of schematics, blue prints and charts 20 Promote Effective Communication 21 Undertake Commissioning / Decommissioning
Eductation
Electrical Engineering
Certification
Boiler Certificate of Proficiency of the First Class, Held in July,24.2000, Benete, West Sumbawa, Indonesia. (Boiler Operation License no:6015/ALKON/OB-I/VII/2000) Certificate III in ESI Generation Sector (Operation ) Coal Plant, herein is recognized within the Australian Qualification Framework. Certificate of competence in First Aid Training Level Two, International SOS an AEA Company Certificate of skill training ELECTRICIAN Organized by PT. FLUOR DANIEL INDONESIA Driver’s License