Engineering: Asia, Middle East and Africa Oil & Gas  Membership Services
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications
Subscriptions
  Business Development 
  Financial & Investment 
  Technical & Operational 
  Procurement 
  Marketing Products 
  Recruitment Products 

Hot Categories
Oil Treating & Refining
Petrochemicals
Ball valves
Gate Valves
Natural Gas
Butterfly Valves
Gas Processing
Blowers
Control Valves
Fire Hydrant
Oil & Gas Companies
Exploration
Transport of Hydrocarbons
Production
Oil and Gas Pipeline
Camp Building
Ecological & Environmental
Events
Oil Field Services
 

Instrumnet QA /QC Inspector


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>

Education: 4
Experience: 10 years
Relocation: Yes - Internationally

Industry Experience
9 years Engineering
9 years Consulting Engineer
2 years Construction Technician

Career Objective

A Challenging position with growth opportunities in a productive, technology based organization. My goal is to construct and maintain installations


Professional Experience

X Instrument selections. .Build, M.T.O .BOQ. Other Related Documentations
X Build up In Instrument selections Data sheets .Instruments Hookup , P&IDS ,ILDS Control Schematic. Earthing LAY OUT, Earth PIT Detail , Cabal Try Route Layout / Cabal schedule .Logic Diagrams / Cause and Effects sheets .
X Use designing software AUTOCAD 2004 . Knowledge Project Planner Primavera .

Job Responsibility During Erection & Commissioning Activities

X Dealing and coordination with other departments and contractors.
X Participate in FAT (Factory Acceptance Test) to ensure equipment complies with project requirements and international standards prior to delivery at site.
X Conduct SAT (Site Acceptance Test) of controls and instrumentation on packaged equipment.
X Site Inspection / Supervision
X Installation / Startup commissioning & maintenance.
X Monitoring of the installation of field instruments with relevant Hook-ups, weight/Leak test for Impulse lines, Multi-core cable laying and termination.
X Instruments calibration & signal loop checking ,testing and calibration of gauges, Smart transmitters, switches, indicators, control valves, and shutdown / blow-down valves.on running plant.
X Testing, Calibration and Refurbishment of PSVs.
X Testing of Fire and gas detection system which include smart Fire and Gas Detectors and Line of Sight Gas Detectors.
X Trouble shouting ESD (Emergency Shutdown) system with Cause and Effect Matrix .
X System. function Test checking.
X Loop Testing of Process area and well head instrument Oil/Gas Producing wells, Remote & Central Controlling Stations, Gas Turbines.
X Well Head Safety Controls, Fire Detection, Toxic Gas Leak Detectors
X Use different Calibration Instruments tools Ametek , Jofra Calibrators / Hart communicator 375.
X Solar Power System powering well head Instrumentation.
X Self Regulated Battery, Charging Controllers .
X Impressed Current Cathodic Protection System for Xmas tree & Flow lines.
X Corrosion Inhibitor Injection system into down hole, Annulus & flow lines
X Remote System Control & Status Indication through SCADA .
X DCS SYSTEM EMERSON (Delta-V) ABB Process Control System.
Plant safety

X Construction activities without compromising Company HSE Policies and Practices

Eductation

EDUCATIONAL QUALIFICATIONS:
Year Degree / Certifications Board / University Majors
1995 Diploma Associate Engineer (DAE) Electronics' Govt College of Technology Electronics'

2000 B..E Mehran Engineering University Jamshoro. Electronics'

SUPPLEMENTARY EDUCATION/ PROFESSIONAL TRAINING:
Certification
Year Certification Certifying Institute Subject
1996`` Diploma in computer Maintenance Petroman Training Institute Karachi Control studio Delta V
Autocad 2000
Network trouble shouting
& Maintenance
1999 -2001 Industrial apprentice ship Engro Asahi Polymer & chemicals Instrumentation / Control Systems Engineering
Additional Information
Jan 2007- still To Date

Zishan Engineers (Pvt)Ltd.


Instrumnet Design Engineer

Sep 2003 to dec2007
Descon Engineering MiddleEast Abudhabhi UAE
1. Gasco Buhasa BU5 Plant Ext.
2. 2.ULG/LSGO Takreer Ruwais Refinery complex
3. ADCO BAB Expansion Project Habshan .
4. 4. ADCO BAB Well heads .

Instrument Supervisor


Mar 2003 July 2003
ENAR PETROTECH
Project. OMV Kadanwari Gas processing plant. Instrument QC
Inspector

Oct 2001VFeb. .2002 SIEMENS Siemens Pakistan Engineering.
Projects : 1.ENR PetroTech ( condensation Plant )
2.HUBCO POWER PLANT
Instrument V QC Inspector

99 Sep sep 2001 Engro Asahi Polymer & chemicals
Trainee, Instrumentation / Control Systems .

 

Job Opening

Our Career Center has 70,000+ resumes for employers to search
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Gulf Oil and Gas B2B marketplace:   About -  Advertising -  Competitive Intelligence -  Talent Solutions -  Membership Services Follow us on Facebook
Copyright Universal Solutions All rights reserved. Privacy Policy. - Contact Us  Gulfoilandgas rss feed