To grow as an effective Professional and drive the company in a manner which will help the company to move towards the higher targets as well as to help myself to strengthen my job competency.
• Construction program using primavera • Turn around document • Manpower histogram & S curve
And also preparation of o Conceptualize detailed project reports and project execution plans. o b. Project evaluation in terms of outlays. Prepare reports for planning and execution; o Lay down and ensure adherence to quality procedures across projects o Establish time span of project execution. o List down the resource needs for projects
Project Handled: 1. Water Treatment Plant at Sohar 2.STP at Buraimi 3 .Southern Expressway- Utilities 4.Airport at Qarnalam
About Galfar: Galfar is one of biggest in company in the sultanate of Oman. Its having various branches in various parts of GCC & Nigeria
• Preparation of pipe line layout drawings for clients • Measurement of Quantity
3. Mechanical Engineer (2003-2005) Hindustan Insecticides Limited, Cochin Experience : Two Years
Duties & Responsibilities • Planning and execution of maintenance activities of various types of pumps, compressors, fans, centrifuges. Mixing mill, valves condensers • Estimation of type, quantity quality of maintenance. • Most economical way of doing work, how and where the work will be done(Depending up on location of engine, the usage Operating time) • Requirement control of material. • Requirement control of tools • Assignment of work • Determine when&inwhat sequence work will be carried out • Preparation of process report to engineering manager
Eductation
Bachelor in Technology (B.Tech, Mechanical)
Qualification Specialisation Name of the University Year B-Tech Mechanical Cochin University of Science And Technology(CUSAT),Cochin,Kerala,India 1999-2003 67% . •
Certification
Primavera 3.1 from Cadcentre &Primavera 6 • AutoCAD 2003 from Cadcentre(Autodesk certified)