Gulf Oil and Gas accountACCOUNT

Instrument engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 3 years
Relocation: Yes - Internationally

Industry Experience
3 years Control Engineer

Career Objective

PLC ABB SLC 5/04;SLC5/03;MICROLOGIX 1500, RS LOGIX 500, PANEL VIEW;WONDERWARE;PROWORX 32;VIJEO DISEGNER SIEMENS S7, MITSUBISHI, TOSHIBA, MARIAN, SAP, MIRCROSOFT OFFICE AUTOCAD.instrumentation frendly emerson, yokogawa

Professional Experience

I. EXPERIENCES
PEC-TECH INDONESIA
Job Assignment

1. Riau Andalan Pulp & Paper (RAPP) Kerinci Riau
2. Pec-Tech Project Kerinci, Riau, Pectech China
3. Pec-Tech Service Indonesia Kerinci (PTSI)
4. Forindo Pte Ltd (Singapore)
5. Asian Agri Medan
6. Toba Pulp Lestari (TPL) Medan -
7. APRIL SSYMB Rizhao (China)
8. Sateri Jiang Xi Chemical Fiber Jiu Jiang (China)


KOTA MINYAK AUTOMATION
(Project Engineer in KOTA MINYAK AUTOMATION from 1 Maret 2008 – 31 December 2008)
Responbilities:
To Create Project wiring diagram, Program PLC and SLC, create HMI and MMI and training project and commissioning project

1. PT Medco Energy And Power (Oil & Gas) in South Sumatra, in Kaji (Betung, Banyu Asin) and Jene in (Prabumulih) – Perform Training and Commisioning Project “ Simulator Kaji & Jene” make SLC 5/04 and Panel View Allen Bradley series 1000;contact person: alif (08122146301);denny(08127127162) and given training configuration communication.
2. PT Polychem Indonesia ( Petrochemical) in Suralaya Banten – Perform to create project and commisioning Project “ Ethyelene Booster Compressor” make Quatum Schneider and MMI make Magelix XBGT series.;contact person: mr chris castro (08159700958)
3. Total Energy And Power Indonesia (Oil & Gas) in South Kalimanta, in tunu – perform commissioning project “TUNU PHASE 11 TP11N/EPSC 11+12 , Air Compressor” make SLC 5/04 and Panel view Allen Bradley series 550.contact person: mr louiz ruiz (0811906076), and given training configuration communication.
4. PT Chevron Pacific Indonesia ( Oil & Gas) in Riau, Duri Riau – perform commissioning project “Pungut Waterflood” make make Quatum Schneider and MMI make Magelix XBGT series.contact person: azumar ridwan
5. PANELMATE; PT Chevron Pacific Indonesia ( Oil & Gas) in Riau, Duri Riau – perform commissioning project “Bekasap Waterflood” make make Quatum Schneider and MMI make Magelix XBGT series; azumar ridwan

ANTA AUTOMATION
Responbilities:
To Create Project wiring diagram, Program PLC and SLC, create HMI and MMI and training project and commissioning project, Gas Metering, Tank Gauging, Calibration ( Instrument Well Head)






Eductation

Riau University: Electrical Engineering..2002-2006

Certification

Schneider Unity Pro
Training Chevron Minas-Indonesia

Hot Categories

Oil Treating & Refining Petrochemicals Gas Processing Ball valves Gate Valves Natural Gas Scrubbers Surge Vessel - Bladder Type Surge Vessel - Compressor Type Surge Vessel - PAA Type Oil & Gas Companies Exploration Transport of Hydrocarbons Production Ecological & Environmental Oil and Gas Pipeline Health, Safety and Environment Offshore Platforms Oil Field Services Shipping Lines

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.