I aspire to augment to my existing knowledge the dynamism of professional experience, hence enriching my knowledge and skills and making myself triumphant in the quest for excellence in my field through hard work, dedication and devotion.
Professional Experience
Worked as an E&I Project Engineer at Nishat Power Plant 200MW CCPP (11Gensets,1 steam Turbine) erraction under Flowtronix Pvt Ltd. Responsible for 132/15 KV ABB Switchyard erraction& 4×65MVA Power Transformer & its accessories Erraction &. Installation and Pre-commissioning & commissioning.
Worked as an E&I Project Engineer at ICI Polyester Fibres Pakistan LTD on Power Gen (8MW Power Exporting project) Erraction under Flowtronix Pvt Ltd. Responsible for Designing the Route for 132kv Grid Cabling , 132/11KV Grid Cabling, Installation of Outgoing Feeder Panels, Design of Cable Tray and Installation ,Pre -Commissioning of Areva Switchgear , Configure CDG61 Relay with Areva.
Working as an Instrumentation & Control(IC) Project Engineer at Hubco Power Plant Man Diesel SE 220 MW CCPP (11Gensets,1 steam Turbine) erraction under Flowtronix Pvt Ltd. Responsible for FEDC(Field Engineering and Documentation Control) and Cabling and termination of whole plant
Eductation
2004-2008 University of Central Punjab, Lahore B.Sc Electrical Engineering CGPA: 3.94 (With Specialization in Electronics and Telecommunication)
Certification
VB.NET and SQL Server certification with 86% marks
Additional Information
First Position in University (2004-2008) Outstanding performance in study Award in University(2005) Member of winning team in cricket tournament(2005) 2nd position in Project Competition in University 2nd position in Quiz Competition in University Outstanding performance in study Award in University(2007) Volunteer in Service Certification Appreciation letter from Wartsila Finland Oy Appreciation letter from Siemens Italy