• Project coordinator for installing new PET line. • 1/6/2010 production line owner – responsible for production and maintenance efficiency improvement. • Preparing planned maintenance schedule for PET production line 3 • Installing PROCOMAC new filler in PET carbonated soft drinks production line 3. • Modifying a manual packaging process into a semi automation process by installing conveyors and automatic weighed on the production line. • Execution of automated glucose feeding pip system for center filled gum. • Building process map for all production lines. • Calculating OEE “overall equipment effectiveness”. • Calculating TAKT time for whole the product. • Cycle time calculation for all production lines • Installing cooling room and freezing rooms in some of fruits and vegetables farms and meet industrial factories. • installing Central air condition including chillers ,fan coils and water piping system to the medical center attached to EL HOSARY mosque in 6 OCTOBER city. • Installing air conditioning units for the production hall.
Eductation
• Higher technological institute in 10th of Ramadan city – Cairo – Egypt – Mechanical Engineering –fair - January 2004.
Certification
• (2002) Auto Cad 3D 2004 – YAT training center. • (11/2007) Project management – “AUC - American university of Cairo”. • (3/2008) Predictive maintenance planning – AUC. • (4/2009) TQM – “Total Quality Management” – AUC. • (at current) Project Management Professional (PMP) – American chamber of commerce in Egypt.