TO be one a professional company and use my skill to assist the company in becoming successful.
Professional Experience
APR. 2009 - AUG. 2009 Employer : BOONYANUCH ENGINEERING CO.,LTD Position to : Construction Engineer Project TUPI (FPSO’s Mudule) Steel structure fabrication 300 tons
JUN. 2008 - MAR. 2009 Employer : LAMPRELL ASIA CO.,LTD Position to : Production Supervisor for Rig maintenance
AUG. 2007 - MAY. 2008 Employer: CTCI (THAILAND) CORP. Position to : QC. Mechanical Inspector (for Fired Heater Furnaces Fabrication.) Project : Production Quality Improvement (Plant Upgrade) Client : The Bangchak Petroleum Public Co., Ltd. Work Volume: 4 Fired Heater
SEP. 2003 - AUG. 2007 Employer: THAI NIPPON STEEL ENGINEERING & CONSTRUCTION CORP. Position to : Structure Field Engineer. Project for reference as below
Dec’04 - Aug’07 Project : Arthit 3B-I & 3B-II Client : PTT. Exploration & Production Public Co., Ltd. Work Volume: Wellhead Platforms 6 units. -Living Quarters Platform 1 unit. -Bridges 2 units and Flare Bridge 1 unit. -Jacket Tripod 1 unit. (for support the flare bridge)
Sep’06 - Jun’07 Project : Nang Nuan (Phase I & Phase II) Client : PTT. Siam Limited. Work Volume: Tri-pod wellhead platform 1 unit.
Jul’04 - Dec’04 Project : Project Suvarnabhumi International Airport Main contractor: Italian-Thai Development Public Co., Ltd. Client: ITO. Joint Venture Co., Ltd Work Volume: Steel Structure Fabricate total weight 600 tons.
Sep’03 –Jul’04 Project : Chevron MFP Stage II Client : Chevron offshore (Thailand) Limited. Work Volume: Wellhead Platforms 6 units
JUL. 2000 – SEP. 2003 Employer: BANGKOK INDUSTRIAL BOILER CO.,LTD. Position to: Production Engineer / Site Engineer Project for water tube and fire boiles fabrication&installation.
JUN. 1996 - JUN. 2000 Employer: B.P.M. MACHINERY LTD. Partnership Position to: Production Supervisor. Work descriptions are general steel fabrication works, machine tool works.
OCT. 1988 - JAN. 1996 Employer: SU. SERVICE LTD. Partnership Position to: Fitter and Lathe-man Work descriptions are general steel fabrication work.
Eductation
1998 - 2000 : Bachelor’s Degree of Industrial Technology in Production. (Industrial Engineering) King Mongkut’s Institute of Technology North-Bangkok (KMIT-NB) Bangkok, Thailand. 1996 – 1998 : High Vocational’s Certificate in Machine Tool Technology. Rajamangala Institute of Technology, Bangkok Technical Campus, Bangkok, Thailand 1993 – 1996 : Vocational’s Certificate in Machine Tool Technology. Samutprakran Technical College, Samutprakarn, Thailand. 1983 – 1987 : Junior High School Rajaweenid Bang-Kaew School, Samutprakarn, Thailand.
Certification
: Radiographic Test Level II In-house Training Course, Conducted by METCON DNDT Co., Thailand. : Magnetic Particle Test Level II In-house Training Course, Conducted by SK NDT & Inspection Co., Ldt. Thailand. : Liquid Penetrate Test Level II. In-house Training Course, Conducted by SK NDT & Inspection Co., Ldt. Thailand. : QC. & Welding Inspector In-house Training Course, Conducted by SK NDT & Inspection Co., Ldt. Thailand. : Internal Auditor ISO9000:2000 Training Course, Conducted by ACEE Management International Co., Ltd : Basic Offshore Safety Training Course, Conducted by TPTI Co., Ltd Thailand : AWS D1.1 2006 Seminar course, Conducted by Thai German Institute, Thailand : CSWIP.-RI. Radiographic Interpretation (Welds) Training Course, Conducted by Mermaid Training and Technical Services Ltd. Thailand
Additional Information
I have experienced in construction work for foruteen (14) years. In generally my jobs was wellhead platform fabrication (jackets, decks, and bridges), process piping, boilers & equipments, pressure vessels, fired heater furnaces, heat exchangers, steel structures for power plant general steel structures, and maintenance of rig. In value are supervision for production, installation and quality control.