I know well how to operated DCS and PLC operation and main control panel equipped with the most modern sophisticated pneumatic, electro-pneumatic instruments and monitoring of all pressure, temperature, level, flow and vibration indicator.
Professional Experience
Current Employer
Qatar steel company Messaieed Qatar,
Work as a Operator in Utility Plant (AS/DR GAS),
Now I am working in QATAR STEEL UTILITY PLANT. As a Operator .
Working Place : Natural Gas Receiving Section
(1) Natural Gas Receiving and separation Section
Working Place : Instrument air and Plant air Section
A. 09 Number of screw type air compressor. Each of the compressor capacity ¡V 2800 NM3 /H and 04 number of Instrument air compressor . B High pressure reciprocating O2 compressor ( Suction Gas Engine MFG Company Ltd ) C Rix High pressure reciprocating N2 compressor.
Working Place : Water Treatment Plant
A . High capacity clarifier B. Thickener tank C Setline pond D. CTW ( contaminate Water treatment ) E. MCW ( Machinery cooling water ) Cooling water treatment . F.CBW ( Cluster barker water ) Cooling water treatment . G. SGW ( Seal gas water ) Soft water treatment . H. Softner I . Fresh water treatment plant. J. Potable water treatment plant. K. DME water treatment plant L. Ammonia removing plant.
Previous Expi :
Working Place : Natural Gas Receiving Section
NATURAL GAS RECIVING STATION
„« NG scrubbing section : Press. 28 kg/cm2. 150C. To remove dust particles and higher hydrocarbons from Natural Gas. „« NG Booster Compressor : The raise the pressure from 28 kg/cm2. to 37.5 kg/cm2., Temp. 1500C to 5000C . „« Reforming (Primary) : ICI steam Reforming process. Catalyst : Nickel Based Inlet Press. Temp. = 36 kg/cm2./ 4400C , Outlet Press/Temp. -30.5 kg/cm2./ 7880C . Steam/Carbon Ratio : 3.5 „« Reforming (Secondary) : To introduction Nitrogen (N2) in the process gas steam by introduction of compressed air from Air Compressor. Catalyst : Nickel Based. Inlet Press/Temp. -30.5 kg/cm2./ 7880C , Outlet press/Temp. -29.8 kg/cm2./ 9900C Process Air/Process N.G. : 1/51. „« Boiler : Capacity ¡V 250 T/M, Press. 100 kg/cm2, temp. - 5000C .
Working Place : Compress Air Section
Eductation
Educational Qualification :
Examination Board/University Year of Passing Subject Group Division
S.S.C Dhaka 1991 Physics, Chem, Math. Science First H.S.C Dhaka 1993 Physics, Chem, Math. Science First B.Sc.( Bachelor of science ) National University 1995 Chemistry Science Second
Operation Safety & Process Technology (OSPT) Training Institute for Chemical Industries (TICI) 1996-1997 OSPT Industrial Diploma ¡¥B¡¦ Grade
International English Language Testing System. (IELTS) British Council 08-04-2006 Reading, Writing, Speaking & Listening English 5.0
Certification
Technical Qualification Obtained:
1. Industrial Safety and Prevention of Accidents.
2. Industrial Boiler & Operation of Steam Generation System.
3. Industrial Water Treatment & Operation of water treatment plant .
4. Certificate in Computer Application, Adobe Illustrator, Software Installation and Hardware Assembling with Trouble Shooting.
5. Basic Concept of Distributed Control System (D.C.S.).
6. Working Principle, Operational Behavior & Characteristics of Pumps.
Additional Information
Computer Literacy : Certificate in Computer Application (Micro Soft Office Package), Adobe Illustrator, Software Installation and Hardware Assembling with Trouble Shooting .
DCS Knowledge : Yes. 2 (Two) weeks Training institute for chemical Industries. Ghorashal, Narsingdi.