Be part of the development and construction of the Oil and Gas projects at the Gulf.
Professional Experience
Job Experience 2008 – Actual. ATZ Panamá S.A.– Panamá – Panama Republic Small Business Owner *Planning, *Money management *Marketing.
2004 – 2008 Fundaciones, S.A – Panama – Panama Republic *Management and engineering for waste water treatment plants.
1.997 – 2003 Proyecta S.A. – Caracas - Venezuela *Project and construction management of an agricultural development of 50 ha. Tinaquillo, Cojedes. *Basic and Detailed Engineering of one hundred kilometers of center-western Interconnecting Gas Pipe of 30”. PDVSA. GAS. *Construction’s Superintendent of buildings and Site’s Fire Water System for SINCOR DOWNSTREAM PROJECT (Process and Utility Package).. *ACLS Quantity surveyor and subcontractor commercial issues for SINCOR DOWNSTREAM PROJECT (Process and Utility Package).. *Civil designer ( Drinking water, waste water and drainage system) of buildings for SINCOR DOWNSTREAM PROJECT (Process and Utility Package). *Civil underground Interface coordinator SINCOR DOWNSTREAM PROJECT (Process and Utility Package). 4500 M $. *Basic and Detailed Engineering of Service Facilities of housing project, El Paural, Guarico State. CONAVI *Development of base line and diagnosis of Hydraulic and Sanitary conditions in Easter Venezuela. ( D.A.O.) Desarrollo Armonico de Oriente. P.D.V.S.A. *Environment Impact Study. Caracoles Oil Field (CNPC).(China National Petroleum ) *Health and security programs. Solid Debris Handling. Caracoles Oil Field (CNPC). *Basic and Detailed Engineering of 16” of Gas Pipe GNV. Barquisimeto and Caracas. PEQUIVEN S.A. 1.996 - 1.997 Inversiones The Hills. Design and construction’s supervision of service facilities of housing project. Margarita Island - Venezuela
1.995 – 1.996 Ingeniería RD C.A. *Resident engineer and planner of constructions and maintenance of potable and waste water and drainage systems. Hidrolago.
1.994 – 1.995 Constructora Morao y Parés C.A. *Engineering and Construction of potable Water Tank and access to Water Treatment Plants 1.993 – 1.994 Hidrocapital Panamerican Potable Water System *Maintenance and Operation Chief engineer Coordination and Supervision of: *Preventive and corrective Potable Water System Maintenance, Los Salias, Los Teques and Carrizal Counties. *Preventive and corrective Maintenance of Agua Fria Water Reservoir. Laguneta Water treatment Plant.
Eductation
1984 1992 Universidad Central de Venezuela Civil Engineer ( Sanitary) 2007 2007 Universidad Tecnológica de Panamá Title convalidation Training: Project Management modules I & II for PMI; PMI-ADR Technologies. Panamá Base Line Development for Impact Environmental Evaluation and Plan Management ULACIT, Panamá ACLS (Automatic Craft Ledger System) HALLIBURTON, Venezuela Sanitary Engineering MC Universidad Central de Venezuela Autocad – Autocivil PROYECTA CORP, Venezuela Maintenance and operation of Potable Water System Universidad Católica Andrés Bello, Venezuela Maintenance Techniques Grupo 8086, Venezuela Management Formation Program Instituto de Estudios Superiores de Administración (IESA), Venezuela
Certification
(Automatic Craft Ledger System) – HALLIBURTON and EPSON Autocad