I am an engineer with a university diploma and more than 23 years work related experience. looking for construction site jobs within Oil & Gas industry
Professional Experience
2008 May - up to present British Petroleum Construction site Field engineer. 2007 January - 2008 May British petroleum (UK) – Saipem (Italy) – International Operating Company (consortium of the international companies) Working for BP- AIOC- Saipem in an “Azeri – Chirag -Guneshli” Project at the Caspian Sea Transportation and Installation team Heavy jackets and topsides transportation and Installation offshore field engineer. 2005 October - 2007January British petroleum (UK) – Saipem (Italy) – International Operating Company (consortium of the international companies) Derrick Barge Azerbaijan (with the 2500t crane) and STB- 1(Heavy Jackets and topsides Transportation barge) Vessels Upgrade and Refurbishment project engineer. 2004 March – 2005 October Derrick Barge Azerbaijan (with the 2500t crane) Offshore installation field engineer 2003January - 2004 March DBA( derrick barge) and STB-1(Transportation barge) Quality control and quality assurance engineer (QA/QC) 22/09/1986 – 26/10/1989 Project Engineer on the oil rigs in Caspian Sea CMOF – Caspian Marine Oil Fleet
Eductation
1982-1989, Baku, Azerbaijan Mechanical Engineer Department of Mechanical Engineering State Technical University 2003-2004 Internal audit- ISO -DNV (Det Norske VERITAS)
Certification
Technical University Diploma. BOSIET (Offshore survival course) British Petroleum Permit to work New Employee HSSE Induction Task Risk Assessment Energy Isolation Process Working at Height Rigging & Slinging COSHH/HAZCOM Manual Handling RUE cards Confined Space Entry; Competence ASA; SOC Waste segregation Lock out/Tag out system Hazard Identification Fire Fighting-Basic; First Aid Incident Investigation, Etc...
Additional Information
I have been working for BP for the past seven years. During this time I have participated in the installation of 4 Sub Sea Templates, 6 Jackets, and 6 Production Topsides - which included the refurbishment phase of the STB-1 Jacket & Topsides Transportation Barge and the DBA Heavy Lift Crane Barge with lifting capacity of 2500tonnes as part of the project. As I started in the design and engineering part of the project, I was involved in the preparation of the Installation Manuals and Offshore Procedures. I am also familiar within the AutoCAD program and can prepare project drawings. During the last 3 years I have been involved on Saipem’s fabrication yards as Site Representative where I have obtained valuable experience in the organization and management of work sites. I have undergone various HSE related courses and trainings and therefore I have a good understanding and knowledge in this field as well. I have all the certificates that prove my professional and organizational skills, and if necessary, I can provide you with references from my Project Managers that I worked with throughout different projects. I speak fluent, read and write English, Russian and Turkish.