MAY 2008 QATARGAS OPERATIONG COMPANY QATAR MAY 2009 QATARGAS OPERATIONG COMPANY QATAR MAY 2010 QATARGAS OPERATIONG COMPANY QATAR APRIL 2010 QATAR PETROLEM (QP) QATAR Currently working as SENIOR SUPERVISOR (E&I) with DESCON Engineering Qatar L.L.C.
Project: QATAR GAS PROJECT (QATAR) Client: QATAR GAS Duration: 21 APRIL 2009, To Till Date
Responsibilities:
Working with descon engineering on various EPC projects up gradations like To installation of new ULTRASONIC FLOW METER. Calibration ,commissioning Upgrading of FLOW COMPUTER at sour gas line ,wet gas line, dry gas line and spare gas line Installation of temperature transmitter, pressure transmitter as per hookup DWG Upgrading of PILOT EYE for flare flame (LP AND MP, HP) installation termination, commissioning Of pilot eye Upgrading of MAGNATIC FLOW METER at desalination units. Installation commissioning and calibration of transmitter work on BIO GEORGE SYSTEM at sea water out fall installation commissioning and calibration of BIO GEORGE sampling unite for three numbers of trains purgation of H2S ANALYZER installation of analyzer probe analyzer transmitter make ABB installation calibration commissioning of absorber installation of CL2 ANALYZER commissioning calibration of CL2 analyzer sample unit work on SUPHER LOADING ARM installation calibration and commissioning of loading arm installation solo run of DOZING PUMPS, SAMPLE PUMPS, TRANSFFER PUMP
Project: RAS LAFFAN OLEFIN PROJECT (QATAR) Client: TECHNIP Duration: 09 OCT 2007, 20 APRIL 2009
Responsibilities: I am involve in the Plant Field Instrumentation(HART & FIELD BUS FOUNDATION) Pressure, Temperature, Flow, pressure differential Level, transmitters , installation, inspection, testing and commissioning Pneumatic & Motor operated valves Installation, Inspection, Testing and Commissioning Perform preventive, corrective and troubleshooting maintenance, and testing of all Plant Instrument Process Monitoring Control Protective equipment, calibration, repairing and maintenance of different type of smart transmitters, control valves, ON OFF valves, switches (Temperature, Pressure, Flow and Level) pneumatic transmitter. Calibration of smart transmitter’s pressure, level, flow and level with Hart communicator
Eductation
Matriculation :Governament Compony Hensive High School Sargodha Pakistan
D.A.E(Electronics:Govt Poly Technical College Sargodha Pakistan
DIVISION: 1ST
Certification
• MS Office (MS Excel, MS Word, MS Power Point, MS Vision) • Good Internet skills 06 month Training Certificate in Instrumentation & Process Control and training of Siemens S7 plc from SIT Institute of Engineering & Technology Training Center Lahore PAKISTAN.
.
Additional Information
TRAININGS SAFETY
1)3 days training course of shut down progress monitoring system by QATAR GAS. 2)4 hours H2S & breathing apparatus certificate course conducted by QATAR GAS. 3)4 hours environmental awareness course conducted by QATAR GAS. 4)4 hours incident & injury free course conducted by QATAR GAS. 5)4 hours permit to work receiver course conducted by QATAR GAS. 6)4 hours electronic permit to work (EPW) receiver course conducted by QATAR GAS. 7)8 hours consolidate permit to work (CPW) receiver course conducted by (RASS LAFAN INDUTRIAL CITY) QATAR 8)8 hours H2S/B.A Training Course from NATIONAL ACADEMY PROFESSIONAL TRANING IN DOHA QARAR 9)Safety induction certificate from Qatar Petroleum (GAS OPERATION) QP