Energetic and self motivated Civil/Structural Engineer. More than 10 years experience in construction and coordination of multi-activities in mix use High Rise Towers and Low Rise buildings.
Professional Experience
May 07 – Date RMJM (Robert Matthew, Johnson-Marshall) Qatar-Doha Position:Resident Engineer/Acting Project Manager Responsibile of coordinating and supervising all construction activities, verification of tests and results, structural and civil shop drawings. Monitoring technical matters pertaining to design development and technical considerations. Responsible of Quality Control/Assurance matters with all aspects. Chairing both Technical and QA/QC meetings. Project: Dubai Towers-Doha (5B+G+7P+5M+84 floors) Client: Sama Dubai. Cost: 2.3 Billion QRs
June 06 – April 07 Al Shafar General Contracting ASGC, Dubai Position:Construction Manager Responsible of job execution, setting out, coordination with MEP works, reinforcement shop drawings, finishing shop drawings, weekly time planning, master program updating, quantity surveying, material orders, daily and monthly reporting, subcontractors and main contractor monthly payment certificates.
July 01 – June 06 Al Meraikhi General Construction Est., Abu Dhabi Position: Senior Project Engineer Responsible of job execution, setting out, coordination with MEP works, erection of steel members, reinforcement shop drawings, finishing shop drawings, weekly time planning, master program updating, quantity surveying, material orders, daily and monthly reporting, subcontractors and main contractor monthly payment certificates.Also responsible of the coordination among GRC, Aluminum and Steel structures subcontractors and the safety systems required.
•Feb 06 – June 06 Project: Gold Crest Views 2(5B+G+40 floors) Client: STAR GIGA Establishment Limited. Consultant: WS Atkins & Partners Overseas. Cost: 200 Million AED •Mar 04 – Feb 06 Project: The WAVES – RESIDENTIAL TOWER (Two towers on a podium consisting of 3B+G+25 floors and 9 floors) Client: DAMAC PROPERTIES Consultant: NORR GROUP Cost: 125 Million AED •July 01 – Mar 04 Project: ABU DHABI FUND Head Quarters (B+G+7 floors) Client: ABU DHABI FUND for Development Consultant: GIBB LTD
June 99-Jan 01 Modern Construction Company, Beirut, Lebanon Project: Mikalles Levant Hospital (6B+G+6 floors) Client: Levant Hospital Consultant: Maalouf Consultants and Engineers Cost: 15 Million US $
Eductation
• Dec 2000 Notre Dame University, Zouk Mosbeh, Lebanon Bachelor of Engineering in Civil Engineering • Studying M.S. Int'l Construction Management
Certification
• June 2009 Member of Qatar Engineer’s in UPDA-Qatar • July 2009 Quality Concrete & Related Field Testing Practices certified as per ACI “American Concrete Institute” Grade I, ACTS, Beirut, Lebanon • Feb 2008 Professional Project Management (PMP Certification Preparation), CMCCO, Doha, Qatar • Feb 2008 FIDIC Conditions of Contract & Claims Management, CMCCO, Doha, Qatar • Oct 2003 Certificate of Internal Auditor, Integrated Management System (ISO 9001:2000, ISO 14001:1996 & OSHAS 18001:1999) RWTÜV, Abu Dhabi, UAE • 2001 Member of Lebanese Engineer’s Syndicate.
Additional Information
• English and Arabic (Fluent in Spoken and written) • Proficient in Engineering Software: STAAD III, AutoCAD, Microsoft project and Microsoft office Programs (Word, Excel, Outlook and PowerPoint). • Excellent communication skills, able to work independently & as a team member, adapt to a wide variety of environments, a fast learner, welcome challenging situations & responsibilities. • Qatar/UAE Driving License