JOB RESPONSIBILITIES HELD: •Creating General arrangements and detailed fabrication drawings of heavy steel structures, Drilling Rigs, Steel Bridges, Platforms, Buoys etc.
•Creating General arrangements and detailed fabrication drawings of other fabrication works including plate development.
•Creating General arrangements and fabrication drawings for smoke tube boilers
•Site measurements for site installation jobs and preparing fabrication drawings according to the site conditions.
•Preparing NC Program for plate cutting and nesting it to optimize the plate utilization.
•Preparing BOQs and weight calculations for estimations.
•Correspondence with customers
MAJOR PROJECTS INVOLVED(Oil & Gas/Petroleum industry):
•QUEIROZ GALVAO, OLEO E GAS, SBM Offshore Systems (Project: LONE STAR TDS-2000, RIG-01)
• DELBA DRILLING INTERNATIONAL COOPRATIE U.A., SBM Offshore Systems) (Project: DELBA III, TDS-2500, RIG-03 ENCANA, SBM Offshore Systems, (Project: JACK-UP PRODUCTION PLATFORM “DEEP PANUKE PFC”)
BOG/SRU project for “Adgas”. Detailing generating drawing and Bill of Materials for the project which consists of 800 Tons of steel. The project is located at Das Island, Near Abu Dhabi, United Arab Emirates. Project Consultants: Chiyoda Corporation, Japan. Project Contractor: Costain Abu Dhabi Company W.L.L
Storage Tanks Preparation of G.A and fabrication drawings for storage tanks Customer: Abu Dhabi National Oil Company (ADNOC)
Preparation of detailed fabrication drawings for Pontoons Customer: National Marine Dredging Company, Abu Dhabi.
Preparation of detailed fabrication drawings for Tanks Project: BeAAT facility, Takreer. Consultants: SNC Lavalin, Customer: Punj Lloyd.
Preparation of detailed fabrication drawings for Tanks Customer: METITO (OVERSEAS) LIMITED.
Eductation
1997-2000 - Diploma in civil Engineering. Sree Narayana Polytechnic Kottiyam,Kerala university(72%) 1997 - T.H.S.L.C, Technical High School Ezhukone.(Kerala.) State Board(79%)