Drilling Equipment: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

GE Wins Contract to Supply Equipment for OGX Projects

Source: www.gulfoilandgas.com 9/20/2011, Location: South America

Share |

GE Oil & Gas (GE) has been awarded a major contract from OGX Petroleo e Gas Ltda. to supply drilling and production equipment for three offshore fixed production platforms to be deployed in the Waimea and Waikiki oil and gas fields of the Campos Basin, offshore Brazil, where OGX plans to drill a significant number of production wells over the next four years. With a total potential estimated value of US$230 million over the next four years, of which US$32 million on formal orders has been already signed and booked as of today, this is the largest contract ever signed between GE Oil & Gas and OGX and the first one involving the supply of equipment specifically for development projects already in the production phase.

As a key part of the agreement, GE will provide a subsea template/tieback design that will allow OGX to have full flexibility between wells pre-drilled with semi-submersible rigs and wells drilled directly from the fixed platforms. This capability will help OGX to boost initial production of the Waimea and Waikiki fields by maximizing the use of the pre-drilled wells. GE’s template design has been field-proven in similar projects in West Africa.

“Our goal was to find a viable technology solution that gave us maximum flexibility in the development of the Waimea and Waikiki fields, and GE was able to meet that challenge,” said Reinaldo Belotti, production development director of OGX. “We are confident that GE’s continuing support and timely deliveries will be an important factor in the long-term success of this project,” reinforced Belotti.

The Waimea and Waikiki fields are located 60 kilometers off the coast of Rio de Janeiro, in water depths ranging from 120 to 140 meters. GE Oil & Gas is committing to 80 percent local content in fulfilling the contract, with most of the subsea equipment to be built at GE plants in Jandira and Macae, Brazil. Surface equipment will be partially supplied from GE facilities in Houston, Texas. Shipments will begin in the first quarter of 2012 and continue until the end of 2015.

“This is a major strategic win for GE Oil & Gas in Brazil, resulting from 13 months of outstanding teamwork among various GE business units and OGX,” said Calixto Deberaldini, Brazil oil and gas sales manager for GE. “The agreement builds upon our already strong relationship with OGX, which is one of our most important global customers,” emphasized Fernando Martins, Latin America vice president for GE Oil & Gas.

This latest agreement with OGX reinforces GE’s role as a leading supplier of subsea drilling systems for offshore operators in Brazil. Since 2007, the GE drilling and production business has provided more than 300 subsea wellhead systems to 15 different operators for projects offshore Brazil.

Drilling Equipment >>

Drilling Equipment News in Brazil >>

Latin America Oil Demand in September 2014
Brazil >>  9/17/2014 - In Brazil, the pace of total oil demand growth slowed during the month of June 2014, easing from the high levels seen in the first five months of 2014...
GE Awarded over $300m Subsea Contract from Petrobras
Brazil >>  9/17/2014 - GE Oil & Gas signed a more than $300 million contract with Petrobras for the first supply of the subsea manifold systems for Brazil’s pre-salt fields,...

Aker Wayfarer Wins $465m Contract from Petrobras
Brazil >>  9/15/2014 - Aker Solutions' subsidiary Aker Oilfield Services (AKOFS) has won a contract worth USD 465 million over five years from Petrobras to provide subsea in...
Brazil Economy in September 2014
Brazil >>  9/14/2014 - Data released late last month by Brazil’s national statistics agency showed a 0.6% GDP contraction in the 2Q, following a downward revision for the 1Q...

Robust Oxygen Analyzer Approved for Hazardous Area Use in Brazil
Brazil >>  9/10/2014 - Michell Instruments’ XTP601 Oxygen Analyzer has been approved for use in explosive atmospheres by INMETRO, the Brazilian National Institute of Metrolo...
Technip Awarded EPIC Contract for the Juniper Field
Trinidad and Tobago >>  9/9/2014 - Technip has been awarded a substantial EPIC lump sum contract by BP Trinidad and Tobago LLC for the development of the Juniper project, to be located ...



Related Categories: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Articles: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  General  Handling Tools  Lubricating Equipment 


Brazil Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |

More News

Oil & Gas Projects in Brazil >>

Oil & Gas Companies in Brazil >>

Related Links

Countries Quick Links

AR BM BO BR CL CO EC FK MX PE TT UY VE
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us