|
|
|
Source: www.gulfoilandgas.com 6/13/2012, Location: Africa
|
|
|
|
Rialto Energy Limited provides a weekly update on drilling operations at the Gazelle-P3 ST2 Well, Offshore Cote D’Ivoire as at 06:00hrs, 12 June 2012 (GMT). The Gazelle-P3 well was spudded on 12 March 2012 using the Transocean GSF Monitor jack-up drilling rig. The well is the first of an overall three well drilling programme on permit CI-202. Since the last report the well has drilled ahead under directional control to 2784m MD (2516m TVDSS).
|
|
|
|
|
|
|
More News
Related Links
Countries Quick Links
|