|
|
|
Source: www.gulfoilandgas.com 7/9/2012, Location: Asia
|
|
|
|
"Gas storage wells at Serajeh UGS are ready for full inauguration" ICOFC managing director was quoted as saying.
Mehdi Fakour said 9 wells at Serajeh underground gas storage site are ready to receive, inject and withdraw natural gas and whenever needed, surplus gas consumption of the country could be stored at the reservoir.
He added that the wells are designed to store 1.5 billion cubic meters of gas in the summer and withdraw 4.5 million cubic meters a day during the cold season.
Fakour expressed satisfaction with ICOFC gas production and said last winter gas production from the company hit 313 million cubic meters per day and the output is set to rise this year.
Alluding to the inauguration of several development plans in the company in upcoming months he said once the projects are commissioned, oil and gas production of the company would remarkably increase.
|
|
|
|
|
|
 |
| China Oil Trade - May 2013 |
 |
China >> 6/18/2013 - China’s crude oil imports increased in April by 189 tb/d, or 3.5%, from the previous month, to average 5.6 mb/d, despite lower refining levels. On an ...
|
|
|
| Japan Oil Trade in May 2013 |
 |
Japan >> 6/16/2013 - Japan crude oil imports saw a large decline in April by around 480 tb/d or 11% to average 3.7 mb/d. This decline was a fallback after the increase in ...
|
|
|

|
|
|
| Caspian and China Oil Supply – May 2013 |
 |
Kazakhstan >> 6/12/2013 - Oil production from Kazakhstan is forecast to average 1.66 mb/d in 2013, an increase of 70 tb/d over the previous year, indicating a downward revision...
|
|
|

|
|
|
More News
Related Links
Countries Quick Links
|