Logging, Perforating, Testing: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

Horn Petroleum to Deepen Shabeel North Well

Source: www.gulfoilandgas.com 7/26/2012, Location: Africa

Share |

Horn Petroleum Corporation provides the following update on the Shabeel North well in Puntland, Somalia. Further to the recent announcement on the testing of the upper Jesomma sand reservoir which yielded fresh water, the well continued drilling through the entire Jesomma reservoir section and had reached a depth of 2200 meters. The section contained several additional sands with oil and gas shows and a full set of electrical logs was run to determine if these sands contained potential oil zones which would warrant further testing. The analysis of these logs indicate that the most prospective looking zone in the well was the upper Jesomma sand interval that had already been confirmed by testing to contain fresh water and thus no further testing could be justified.

Based on the positive evidence of oil shows and the presence of good quality reservoir in the Jesomma, the partnership has decided to deepen the well in order to evaluate the potential of the Lower Cretaceous and Jurassic sections. The current revised total depth will be approximately 3400 meters and is expected to take an additional 15 to 20 days to reach that depth. The Jurassic section in the nearby Shabeel well had thin reservoir sands with oil and gas shows, but this section was determined to be not thick enough to warrant testing. These sands are expected to thicken basinward towards Shabeel North. There was also evidence that there may have been faulting in the well which could have cut out a significant portion of the basal reservoir section, which is not expected in Shabeel North.

Horn President and CEO David Grellman stated, "While we are obviously disappointed that the Jesomma sands tested wet, the overall results of the two wells drilled during this campaign are quite encouraging in the long term prospects for oil potential of the basin. We have confirmed a working petroleum system, good quality reservoirs and thick impermeable sealing rocks. The two Jesomma structures drilled to date appear, subject to final petrophysical analysis, to have issues with the integrity of the trapping mechanism. We are still hopeful that the lower zones in the Shabeel North well may have favorable trapping geometries against the deeper thick carbonate and anhydrite sections seen in the original Shabeel well."

The well is being operated by Horn Petroleum which holds a 60% working interest in the Dharoor and Nugaal Valley Production Sharing Agreements (PSA's) along with working interest partners Range Resources (20%) and Red Emperor (20%). Africa Oil Corp. holds an equity interest in Horn Petroleum of approximately 45%.

Logging, Perforating, Testing >>

Logging, Perforating, Testing News in Somalia >>

Oil Search Continue the Testing Operations
Iraq >>  5/23/2013 - Oil Search reports that, the Taza 1 ST2 well was at a depth of 3,351 metres and undertaking a well test on the open hole section, which includes the E...
Leyshon Resources Provide Update On Well Testing
China >>  5/22/2013 - Leyshon Resources Limited advises that, further to the announcement of April 22nd, flow testing of the two wells ZJS5 and ZJS6 by its wholly owned sub...

Pan Orient announce Thailand L53-DC3 Oil Discovery
Thailand >>  5/21/2013 - Pan Orient Energy Corp. is pleased to announce that the L53-DC3 appraisal well is currently on a 90 day production test producing 15 degree API oil by...
HRT Concluded Drilling of 1-HRT-11- AM Well
Brazil >>  5/20/2013 - HRT Participaçoes em Petroleo S.A announces that its wholly-owned subsidiary HRT O&G Exploraçao e Produçao de Petroleo Ltda ("HRT O&G") concluded the ...

Carla South Sidetrack Finds Oil in Block I
Equatorial Guinea >>  5/20/2013 - The Carla South I-7 ST-1 sidetrack to the I-7 exploration well in Block I has encountered oil in good quality sandstones. The sidetrack in Block I in ...
Testing and Production of 2nd Well of Phase-III of Kharsang Field
India >>  5/20/2013 - Jubilant is pleased to announce that KSG#66 (previously referred to as KPL-3E-4), the second of the six development wells of the Phase-III-Extension d...



Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Somalia Oil & Gas 1 >> 


More News

Oil & Gas Projects in Somalia >>

Oil & Gas Companies in Somalia >>

Related Links

Countries Quick Links

AO BJ CD CG CI CM DZ EG ET GA GF GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us