Rig Equipment: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

Rowan Announces Construction of New Jack-Up Rigs

Source: www.gulfoilandgas.com 12/2/2005, Location: North America

Share |

Rowan Companies, Inc. announced plans for the construction of two jack-up rigs to add to its offshore fleet. The rigs will be a new design called the LeTourneau 240C. This design has enhanced environmental and drilling capabilities to meet the ever increasing operational requirements of worldwide exploration and production. Each rig will cost approximately $165 million and will be constructed at Rowan's Vicksburg, Mississippi facility. Expected delivery of the first rig is early summer 2008, and the second in early 2009. Rowan currently anticipates funding construction with available cash, but will consider attractive financing alternatives.

The 240C rigs will have up to 535 feet of leg length, enabling operations in water depths of up to 400 feet, and are designed for high pressure/high temperature drilling. Compared to the 116C design, the 240C rigs will have more deck space, higher variable load, more drilling capacity (two million pound hook-load capability), more cantilever reach (up to 85 feet) and increased personnel on board (120 man). The 240C design will set a new standard as a replacement for the industry's current fleet of 116C rigs, which has been the "workhorse" of the global drilling industry for the past 25 years.

Danny McNease, Chairman and Chief Executive Officer, commented, " The construction of the two 240C rigs, together with the previously announced Hank Boswell and Tarzan IV, will provide us with rig deliveries in each of 2006, 2007, 2008 and 2009. By summer 2006, we will also have nine new land rigs working under term contracts at very attractive day rates. This expansion and acceleration of our construction program will greatly enhance our asset and revenue base and further strengthen our market position."

Rig Equipment >>

Rig Equipment News in United States >>

McDermott Awarded Megalodon Platform Installation in GOM
United States >>  7/21/2014 - McDermott International, Inc through one of its subsidiaries was awarded a contract to provide transportation and installation services to Walter Oil ...
US Oil Supply in July 2014
United States >>  7/19/2014 - US production has been revised up by 130 tb/d from the previous assessment to stand at 12.25 mb/d, indicating a rise of 1.08 mb/d in 2014, the highest...

Jacobs Receives Project Services Contract from BP
United States >>  7/15/2014 - Jacobs Engineering Group Inc was awarded a contract with BP to provide engineering, design and procurement services for the Coker Heater Replacement P...
OECD Americas Oil Demand in June 2014
United States >>  7/7/2014 - The most recent monthly US oil demand data for March 2014 shows no growth compared with the same month one year ago, marking the weakest month in term...

Russia Oil Supply in June 2014
United States >>  7/2/2014 - Russia’s oil supply is projected to average 10.60 mb/d in 2014, an increase of around 0.1 mb/d over 2013, unchanged from the previous month’s report a...



Related Categories: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 

Related Articles: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 


United States Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 |


More News

Oil & Gas Companies in United States >>

Related Links

Countries Quick Links

CA US
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us