Drilling: News for Oil & Gas and Hydrocarbon Industries -- Upstream | Downstream | Alternative Energy  

Gulf Oil and Gas
Oil and Gas Marketplace: Asia, middle east, arab gulf, Africa Africa Projects
  Home  |  Jobs  |  News   |  Events   |  Projects  |  Tenders  |  Community  |  My Account
Products and vendors Services and providers Oil & Gas Software and publications
   Current Headlines       Finance and Investing       Newsletters Archive

News

Second horizontal development well commences in Khurbet East Field
Source: www.gulfoilandgas.com 5/19/2008, Location: Middle East
Drilling

Gulfsands Petroleum announced that the Company has commenced the drilling of the second horizontal development well within the Khurbet East Field ("KHE-6H"). The KHE-6H well will be completed and suspended as an oil producer for connection through the Early Production Facility ("EPF"), scheduled to commence operation by the fourth quarter of 2008.

The KHE-6H well is designed to be drilled and completed as a horizontal producer within the Cretaceous Massive Reservoir ("Massive Reservoir") in the Khurbet East Field. The Company estimates that approximately 50 days are required for the drilling, evaluation and completion of the KHE-6H well.

Upon completion of operations on KHE-6H, the Company will have two horizontal and three vertical producing wells available for oil production through the Khurbet East EPF. These wells will provide valuable production information that will be used for planning and optimising the design and construction of the Khurbet East permanent production facility.


Syria Oil & Gas 1 >> Syria Oil & Gas 2 >>

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Oil and Gas Prices >>
Gulfsands acquires Devon Energy’s 80% interest in Syria Block 26
Gulfsands Commences Seismic Acquisition In Syria
Gulfsands Announces Khurbet East Early Production Facility Construction Completed
Gulfsands Announces Oil Production Commences at Khurbet East Field

www.gulfoilandgas.com
 Quick Links Countries
AE BH IL IQ JO KW OM QA SA SY TR YE

Gulf Oil and Gas E-Marketplace - Promote your Business - About Us

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us