Testing & Inspection: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account
Products and vendors Services and providers Jobs

InterOil Announces Increased Gas Flow Rate at Elk-4 Well in Papua New Guinea

Source: www.gulfoilandgas.com 8/25/2008, Location: Asia

Share |

InterOil Corporation advised that acid stimulation at the Elk-4 well has resulted in a significant increase in its test gas flow rate. The well was tested at 86 million standard cubic feet (mmscf) per day, an increase of approximately 36.5%.

Based on the condensate ratio measured earlier, the well was tested as able to produce at anestimated 18 barrels of condensate per million cubic feet which would equate to 1,540 bbls per dayand is consistent with the estimated rate of 18 barrels per mmscf produced during previous testing atthe Elk-4.

“We are exceptionally pleased with these test results obtained from the Antelope structure inthe Elk-4 well confirming improved deliverability. The Elk-4 well on test, has recorded the secondhighest gas flow rate for a well in Papua New Guinea. These latest results are very encouraging aswe prepare to drill the Antelope-1 well. Decommissioning at the Elk-4 well site has commencedand the rig will be mobilized to the Antelope-1 well which is targeted for drilling in the 4th quarterof 2008,” said Mr. Phil Mulacek, Chairman and CEO of InterOil

Testing & Inspection News in Papua-New Guinea >>

SOCAR Selected Innovene S HDPE Process Technology for Sumgait Project
Azerbaijan >>  4/23/2015 - INEOS Technologies has licensed its Innovene S Process for the manufacture of medium density and high density polyethylene to SOCAR Polymer for their ...
CB&I Awarded Contract for Afipsky Oil Refinery
Russia >>  4/20/2015 - CB&I has been awarded a contract by NefteGazIndustriya, LLC, through project developer MAVEG GmbH, to provide engineering and procurement services for...

China Oil Demand in April 2015
China >>  4/18/2015 - February oil demand in China retained positive growth at an estimated level of 0.34 mb/d, despite moderating growth in the country’s overall economy. ...
Russia Economy in April 2015
Russia >>  4/17/2015 - GDP growth posted 0.4% y-o-y in the 4Q14, the slowest since the 4Q09. Household consumption increased nearly 1%, while government consumption declined...

Technip Awarded FEED Contract for Liuhua Fields in China
China >>  4/16/2015 - Technip and its consortium partner China Offshore Oil Engineering Company (COOEC) have been awarded a front end engineering design (FEED) contract by ...
SOCAR & Maire Tecnimont Sign EUR 350m EPC Contract
Azerbaijan >>  4/15/2015 - The signing ceremony of Sumgayit polypropylene plant project was held on April 15 in Baku.The contract was signed by Farid Jafarov, General Manager of...



Related Categories: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 

Related Articles: General  Hydrostatic Testing  Inspection  Laboratory Services  Non Destructive Testing  Testing 


Papua-New Guinea Oil & Gas 1 >> 

More News

Oil & Gas Companies in Papua-New Guinea >>

Related Links

Countries Quick Links

AZ BD BN CN GE HK ID IN IR JP KG KH KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas B2B marketplace:   About -  Advertising -  Competitive Intelligence -  Talent Solutions -  Membership Services Follow us on Facebook
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us  Gulfoilandgas rss feed