Africa Bids for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

Workover Rig Services

Reference: BID10141 1/3/2010, Location: Africa
Category: Workover Rigs/Services

Ref. No.: C-03524
Issue Date: 03/01/2010
Bid Closing Date: 16.00 Hrs, 17th January 2010
Address response: Petro-Canada Oil (North Africa) GmbH, Khallad Ben Suweed Street, Quadisya Square, Tripoli, Libya
E-mail address: libyaC& P@petro-canada.com

Scope of Work:
Petro-Canada Oil (North Africa) GmbH hereby requests “Expression of Interest” (EOI) from qualifying Contractors for the provision of Workover Rig Services in support of Petro-Canada’s exploration campaign in the Sirte Basin of Libya.

The overall program for the workover rig is anticipated to comprise of the well testing of a portion of the 49 Exploration / appraisal wells to be drilled over the next 3 years.

These wells test will comprise of standard DST strings, retrievable completions or retrievable ESP completions. In addition to the exploration and well testing program of work, it is further anticipated that a number of previously drilled wells will require re-entry for further investigation. The scope of work on these wells may include re-testing, stimulation, workover of existing completion, casing repair and drill out to a deeper interval.

Mobilisation for the workover rig is estimated to be end of the 3rd quarter of 2010 and the contract duration will be 2 to 3 years.

Desert Capable Workover / Service Rig:
a) Workover Rig – 750 HP – 12,000 ft depth capability
b) Hook Load – 300,000 lbs
c) BOP’s – 13 5/8” x 10k WP
d) Racking capacity - +/- 185 stands 3.˝” Tubing
e) Fluid Tank System – 1,500 bbls volume
f) Mixing Tanks
g) Trip Tank
h) Mud / Fluid Pump System
i) Filter Unit – 2 microns
j) Choke Manifold – 3.?” 10k WP
k) Handling Tools for various pipe sizes
l) Swab line and equipment
m) Certified Lifting Gear
n) Crane – maximum – 30 tonnes
o) Fork Lift – 7 tonnes
p) Full Set of safety Equipment and Fire Fighting equipment
q) Rig site offices and accommodation for Rig Superintendent and 3 Operator Company Representatives.
r) Full communication system capable of contact with Company offices in Tripoli, Libya – voice and data. Communications Package must include Internet Capability for the Rig Supervisor and Company Representatives (3)
s) Quick move Camp – minimum 65 persons (excluding camp staff)
t) Provision of skilled personnel, materials, consumables, spares and associated transportation

It will be a condition of the intended tender that any workover / service rig proposed by invited tenderers will be in country no later than the end of June 2010 complete with all necessary Libyan Legal Permits and Documantation in place. If a company does not have workover / service rig as per the above specifications, then their Expression of Interest will not be considered.



Related Articles


Related Prooducts: Workover Rigs/Services Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

For Buyers
Advertise your Purchasing Requests
For Suppliers
Promote your Products

Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us