Reference: GA-12-657 7/31/2012, Location: Middle East
Category: Air Conditioning & Refrigeration
Scope of Work
The Contractor required to provide the following: - Replace the existing A/C units with new units. - The A/C refrigerant gas must be the eco-friendly gas (R407). - Replace all tubes. - Contractor has to offer Trade-in for all old units with tubes.
Period: 1 year – Contractor allowed to quote less
|