Subsea Production: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

Lukoil Extracts Russia’s First Caspian Oil

Source: www.gulfoilandgas.com 4/28/2010, Location: Asia

Share |

First oil was extracted at the Yu. Korchagin field in the Russian offshore of the Caspian Sea. Vladimir Putin, Chairman of the Government of the Russian Federation, participated in the ceremony dedicated to the commissioning of this field.

The Yu. Korchagin field was discovered by LUKOIL in 2000. Its 30. category hydrocarbon reserves exceed 270 million BOE. The maximum expected output is 2.5 million tons of oil and 1 billion cubic meters of gas annually. Between 2004 and 2009, LUKOIL invested a total of RUR 34.4 billion into field development. The Company expects to extract 343 thousand tons of oil till the end of the year.

The field's infrastructure includes the following facilities:
- An ice-resistant stationary platform (IRP-1) equipped with a drilling complex that has a loading capacity of 560 tons to drill wells 7,400 meters deep. The number of wells is 30. IRP-1 was constructed at the Astrakhansky Korabel plant.

- An additional ice-resistant stationary platform (IRP-2) for personnel accommodation. The living quarters can accommodate 105 people. Operation in the autonomous mode can reach 15 days. IRP-2 was constructed at LUKOIL-Kaliningradmorneft’s plant.

- A subsea pipeline with a length of 58 kilometers, diameter of 300 millimeters, and a wall thickness of 16 millimeters. - A floating storage unit. The deadweight is 28,000 tons. It carries a crew of 25 men. The floating storage unit is mounted outside of the Caspian ice zone.

Oil will be transported from the area by shuttle tankers with deadweight of six to twelve thousand tons.

At the moment the third well is being drilled for water injection in order to maintain the formation pressure. The first well was drilled for oil extraction and the second one for extraction of associated gas that will be used for autonomous power supply to the facility.

The Company implemented a unique for Russia engineering and technological solution, which is drilling horizontal wells with a length exceeding 5 kilometers. Due to a regular radial location of the wells, it is possible to simultaneously drill in all productive formations. Monitoring of the drilling process is also conducted from the shore via satellite channel in the on-line mode.

During an oilfield construction LUKOIL conducted satellite monitoring of the northern part of the Caspian Sea. The satellite data were received by the Company’s specialists in the quasi-real mode via the webservice LUKOIL-Kosmosnimki. The monitoring revealed no evidence of oil spills within the boundaries of the Company’s license areas during the whole monitoring period.

Subsea Production News in Russia >>

Russia Economy in April 2014
Russia >>  4/17/2014 - Russia’s GDP growth in 4Q13 advanced by 2% y-o-y following 1.3% growth in the previous three months. The weaker rouble helped compensate for sluggish ...
CB&I Awarded CATOFIN Technology by Shandong Chengtai
China >>  4/15/2014 - CB&I has been awarded a contract by Shandong Chengtai Chemical Industry Co., Ltd. for the license and engineering design of a grassroots iso-butane de...

CB&I Awarded Contract for the South Caucasus Pipeline Expansion Project
Azerbaijan >>  4/14/2014 - CB&I has been awarded a contract valued in excess of $85 million by a consortium led by BP for engineering and project management services for the dev...
FMC Awarded $322m Contract for BP's Shah Deniz Stage 2 Project
Azerbaijan >>  4/14/2014 - FMC Technologies, Inc has received an order from BP to supply subsea systems for its Shah Deniz Stage 2 project in the Caspian Sea. The order has an e...

Shah Deniz Awards $750 million Contracts for Stage 2
Azerbaijan >>  4/10/2014 - The Shah Deniz consortium is pleased to announce that the Stage 2 project continues to progress on schedule with further major construction and supply...
China Oil Demand in March 2014
China >>  4/7/2014 - China’s oil demand continued its increasing trend with January 2014 growth of around 3% y-o-y. This was largely determined by rising gasoline, LPG, je...



Related Categories: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 

Related Articles: Diving Contractors  Dredging  FPSO Vessels and Equipment  General  Marine Services  Mooring Systems  Offshore Platforms  Subsea Production 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 |


More News

Oil & Gas Projects in Russia >>

Oil & Gas Companies in Russia >>

Related Links

Countries Quick Links

AZ BD CN GE ID IN IR JP KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us