Cementing, Stimulation: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

New Fiber System for Reducing Nonproductive Time

Source: www.gulfoilandgas.com 3/2/2011, Location: North America

Share |

Schlumberger announced the release of the Losseal family of reinforced composite mat pills. This system, which combines fibers and solids into specifically engineered pills, reduces nonproductive time (NPT) by mitigating the risk of lost circulation during drilling and cementing operations.

"Lost circulation problems that can occur during primary cementing due to unpredictable downhole conditions, ineffective mud removal or poor zonal isolation result in expensive and time-consuming remedial cementing jobs," said Dominique Guillot, Well Integrity cementing domain manager, Schlumberger Well Services. "Losseal technology reduces the risk of lost circulation during drilling and cementing operations."

Schlumberger has successfully deployed the Losseal system in Mexico, the Middle East and Europe. In Mexico, PEMEX was encountering lost circulations problems with wells in the carbonate Costero field near Villahermosa. Losseal mat pills cured the mud loss problems that PEMEX had encountered, while also increasing mud density and effectively cementing the well without any losses.

"Having the ability to resume drilling soon after severe losses was a valuable gain," said Ignacio Ramirez, sub-manager for Engineering and Design, PEMEX. "We were able to maintain that effect all the way through the cementing process, which was also extremely valuable."

Traditional fiber treatments for lost circulation have relied on data for the fracture width during bridging and plugging. The Losseal design combines fibers with different mechanical properties and high solids content. This design makes it much less sensitive to fracture sizes, as the solid particle size is optimized to plug the network fibers as opposed to the fractures.

The Losseal pill is a flexible fiber additive that uses synergy between physical characteristics of fibers and solids to bridge fractures that can lead to either partial or total losses while drilling. An impermeable grid is created by the Losseal system, which is strong enough to withstand additional pressure from mud density increases, in addition to any other pressure from future drilling or cementing operations. The system also addresses large losses in fissures, saving thousands of barrels of mud during placement.

The Losseal family of reinforced composite mat pills can be applied to applications including circulation losses while drilling, including those greater than 40 bbl/h. The system can also be used with natural fractures, in dolomite and carbonate zones, and in spacers ahead of cement slurries.

Cementing, Stimulation >>

Cementing, Stimulation News in United States >>

Technip, Samsung & Huanqiu Awarded Contract for LNG Project in Canada
Canada >>  5/22/2013 - Technip, leader of a consortium with Samsung Engineering Co Ltd and China Huanqiu Contracting & Engineering Corporation, was awarded by Pacific NorthW...
KBR Awarded FEED Contract for World-Scale LNG Project
Canada >>  5/21/2013 - KBR announced it was awarded a contract by Pacific NorthWest LNG Ltd., a subsidiary of Malaysia’s state-owned oil company (PETRONAS) and Japan Petrole...

Emerson’s DVC6200 Valve Controller without Position Transmitter
United States >>  5/21/2013 - Emerson’s Fisher FIELDVUE DVC6200 digital valve controller series now incorporates a 4-20mA position transmitter that can also be configured as a disc...
Chesapeake Names Robert Douglas Lawler CEO
United States >>  5/20/2013 - Chesapeake Energy Corporation announced that Robert Douglas (“Doug”) Lawler, 46, Senior Vice President, International and Deepwater Operations at Anad...

First Use of NG to Power Equipment for Hydraulic Fracturing
United States >>  5/20/2013 - Cabot Oil & Gas Corporation announces the use of Marcellus Shale natural gas to fracture wells via innovative dual fuel technology. This marks the fir...
Technip Awarded Contract for Polyethylene Expansion Project in Canada
Canada >>  5/16/2013 - Technip was awarded by NOVA Chemicals Corporation the detail engineering, and procurement services contract for the Polyethylene 1 expansion project l...



Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


United States Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 |


More News

Oil & Gas Companies in United States >>

Related Links

Countries Quick Links

CA US
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us