Gulf Oil and Gas accountACCOUNT

This Winter Another Proof That South Stream Has to Be Built

Source: www.gulfoilandgas.com 2/15/2012, Location: Asia

Share |
Alexey Miller, Chairman of the Gazprom Management Committee held a meeting on the South Stream project implementation.

Taking part in the meeting were Leonid Chugunov, Head of the Project Management Department, Pavel Oderov, Head of the International Business Department, and Marcel Kramer, Chief Executive Officer of South Stream.

The meeting participants reviewed in detail the project's current status and noted that South Stream was fully on schedule. Particular attention was paid to meeting all conditions required to speed up the gas pipeline construction launch as early as this December, in line with the assignment by Vladimir Putin, Prime Minister of the Russian Federation. It was noted that the final investment decision on South Stream would be made in November of the current year.

At the meeting, Alexey Miller approved the South Stream Construction Charter. The document specifies the scope of work to be done at the onshore and offshore sections of the project.

“We have brought South Stream to the actual construction stage. It is no exaggeration to say that Gazprom is busy with the project 24 hours a day. This abnormally cold winter, which caused a spike in demand for Russian gas in Europe, is another proof that South Stream has to be and will be built. Europe is in need for the new corridors delivering Russian gas with no transiters,” said Alexey Miller.

Special Report

Pipe Lines Installations News in Russia >>

Russia >>  8/23/2016 - The Economy Ministry announced that the first GDP estimate shows a contraction of only 0.6% y-o-y in 2Q16, after a 1.2% decline in 1Q16. This represen...
Kazakhstan >>  8/22/2016 - Kazakhstan’s oil supply is expected to decrease by 50 tb/d over the previous year to average 1.55 mb/d in 2016, revised down by 10 tb/d from the previ...

China >>  8/20/2016 - The Asian market continued bearish in July, due to weakness seen at the top of the barrel, resulting from pressure by the ongoing oversupply in the re...
Singapore >>  8/18/2016 - At the end of June, product stocks in Singapore fell by 7.5 mb, reversing the build of the previous month to stand at 50.3 mb. At this level, they wer...

Azerbaijan >>  8/16/2016 - ROSEN’s business line Field Products and Services will provide effective equipment for pre-commissioning activities to SPIECAPAG (France) by suppling ...
Kazakhstan >>  8/16/2016 - Wood Group is providing main automation contractor (MAC) services to Tengizchevroil (TCO) for the Future Growth Project-Wellhead Pressure Management P...

Related Categories: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Articles: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 |

Oil & Gas Projects in Russia >>

More News

 

Oil & Gas Companies in Russia >>


Related Links

AZ BD BN CN GE HK ID IN IR JP KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.