Rig Equipment: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account Gulfoilandgas rss feed Follow us on Facebook  Jobs 
Products and vendors Services and providers Oil & Gas Software and publications

BOP Leak Delays Songa Eclipse Rig Delivery

Source: www.gulfoilandgas.com 3/8/2012, Location: Africa

Share |

Songa Venus achieved an operating efficiency of 100% during the month, the rig continues to operate for Petronas Carigali in Malaysia. Songa Mercur achieved an operating efficiency of 100% during the month, the rig is operating for Petronas Carigali in Malaysia. Songa Dee achieved operating efficiency of 93% during the month. The rig has just entered into CCB outside Bergen for 3 to 4 weeks to complete Statoil initiated upgrades. The rig will thereafter continue the 5 year contract on the Gullfaks field for Statoil.

Songa Delta achieved an operating efficiency of 100% during the month operating for Wintershall / Det Norske Oljeselskap. Songa Trym achieved an operating efficiency of 100% during the month operating for Statoil at the Troll field. Songa Eclipse is undergoing contractual acceptance testing in Angola. A leaking component in the BOP has caused delays and repairs are scheduled to be completed within 2-3 weeks. Last portion of acceptance testing will then resume and the rig will thereafter commence its one well plus 18 month contract with Total E&P Angola.

Rig Equipment >>

Rig Equipment News in Angola >>

UAE's Dana Gas Wins Gas Exploration Deals in Egypt
Egypt >>  9/29/2014 - Dana Gas Egypt, has been awarded the North El Salhiya (Block 1) and El Matariya (Block 3) onshore Concessions in the Nile Delta as part of the 2014 EG...
CB&I Awarded FEED Contract for Gas Field Development
Algeria >>  9/25/2014 - CB&I has been awarded a contract by Groupement Isarene, a joint venture between Sonatrach, Petroceltic International plc and Enel Trade S.p.A, to prov...

Africa Oil Supply in September 2014
Guinea >>  9/18/2014 - Africa’s oil production is anticipated to increase by 50 tb/d in 2014 to 2.45 mb/d, indicating a downward revision of 20 tb/d in volume from the previ...
Foster Awarded EPCm Contract by Sasol in Mozambique
Mozambique >>  9/16/2014 - Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group has been awarded an engineering, procurement and constr...

Egypt and Cyprus Agree on Joint Development of Natural Gas Resources
Egypt >>  9/11/2014 - President Abdel Fattah Al-Sisi has issued a presidential decree that ratifies the previously signed framework agreement between Egypt and Cyprus on th...
KBR Wins Contract for Two Ammonia Plants in Algeria
Algeria >>  9/10/2014 - KBR, Inc. has been awarded a contract by Fertial SpA to provide licensing and basic engineering design services to revamp Fertial’s Annaba and Arzew a...



Related Categories: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 

Related Articles: General  Rig Equipment  Rig Operators  Rigs, Coring & Exploration 


Angola Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 |

More News

Oil & Gas Companies in Angola >>

Related Links

Countries Quick Links

AO BJ CD CG CI CM DZ EG ET GA GH GN GQ KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO TD TN TZ UG ZA ZM
Gulf Oil and Gas E-Marketplace - Promote your Business - About Us
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us