Gulf Oil and Gas accountACCOUNT

Maersk Oil finished Drilling (BD-04A) well at Al-Shaheen field, Qatar

Source: www.gulfoilandgas.com 5/23/2008, Location: Middle East

Share |
Maersk Oil Qatar has finished drilling the longest well (BD-04A) in the world with a length of 40,320 feet (12.3 km), beating the 20 year old record of the Russian Kola Peninsula exploratory well. With a horizontal section of 35,770 feet (10.9 km) Maersk Oil's well also extended the company’s previously held world record for the longest horizontal well by 9,000 feet (2.7 km). The entire horizontal section of the well is placed within a reservoir target which is only 20 feet (6 m) thick.

Drilling News in Qatar >>

Cameroon >>  6/29/2016 - Victoria Oil & Gas Plc announces that the Savannah Oil Services Cameroon S.A. Train Rig has arrived by ship to Douala port and the 2,756 tonnes of bul...
Colombia >>  6/23/2016 - Amerisur has commenced drilling operations on well Platanillo 8 on Pad 5 in the Platanillo field in the Putumayo basin of Colombia. Platanillo 8 is be...

Canada >>  6/22/2016 - The Canada-Nova Scotia Offshore Petroleum Board (CNSOPB) permitted Shell Canada to resume drilling with restrictions at its Cheshire L-97 exploration ...
Trinidad and Tobago >>  6/22/2016 - Range has received the approval from the regulatory bodies in Trinidad to spud the MD 51-2 development well. As previously announced, this will be a d...

Australia >>  6/20/2016 - Carnarvon Petroleum Limited is pleased to advise that the operator of the Outtrim East-1 well, Quadrant Energy, has advised that the well commenced dr...
Morocco >>  6/20/2016 - Sound Energy, the European / Mediterranean focused upstream gas company, is pleased to provide the following update. ...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Qatar Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 |

Oil & Gas Projects in Qatar >>

More News

 

Oil & Gas Companies in Qatar >>


Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.