Drilling: News for Oil & Gas and Hydrocarbon Industries  Membership Services »
Gulf Oil and Gas grow your business
Home News Events Projects Tenders Unconventionals Community | My Account
Products and vendors Services and providers Jobs

Maersk Oil finished Drilling (BD-04A) well at Al-Shaheen field, Qatar

Source: www.gulfoilandgas.com 5/23/2008, Location: Middle East

Share |

Maersk Oil Qatar has finished drilling the longest well (BD-04A) in the world with a length of 40,320 feet (12.3 km), beating the 20 year old record of the Russian Kola Peninsula exploratory well. With a horizontal section of 35,770 feet (10.9 km) Maersk Oil's well also extended the company’s previously held world record for the longest horizontal well by 9,000 feet (2.7 km). The entire horizontal section of the well is placed within a reservoir target which is only 20 feet (6 m) thick.

Drilling News in Qatar >>

WHL Energy Grants Extension to AWE to Decide on VIC/P67 Drilling
  Australia >>  11/24/2014 - Australian energy company WHL Energy has agreed to grant a further extension to Peedamullah Petroleum ('AWE') for the election date of the option to c...
Petrobras Completes Drilling of 3-BRSA-1255 Well
  Brazil >>  11/24/2014 - Petrobras completed the drilling of the first appraisal well in the Libra Consortium area, the 3-BRSA-1255 (3-RJS-731), informally known as NW1. Locat...

Apache Spuds Commodore-1 Farm-in Well on EP 390 Permit
  Australia >>  11/21/2014 - Buru Energy has advised that drilling operations on the Commodore 1 well commenced November 21 2014. Commodore 1 is the first well to be drilled as pa...
Ophir Provides Operational Update on Tanzania Recent Drilling
  Tanzania >>  11/21/2014 - Ophir Energy plc announces an operational update on recent drilling in Tanzania. The Tende-1 well was drilled in East Pande by the Deepsea Metro I dri...

Tethys Suspends LE-1 Well in Block 4 for Further Study
  Oman >>  11/19/2014 - The exploration well LE-1 in the eastern part of Block 4 onshore the Sultanate of Oman has been suspended to allow for further studies in the future. ...
Cairn Completes Senegal Drilling Program
  Senegal >>  11/19/2014 - Cairn and its Joint Venture (JV) partners have completed operations on the SNE-1 well in Senegal and plans are now underway to appraise the discovery ...



Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Qatar Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 |

More News

Oil & Gas Projects in Qatar >>

Oil & Gas Companies in Qatar >>

Related Links

Countries Quick Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas B2B marketplace:   About -  Advertising -  Competitive Intelligence -  Talent Solutions -  Membership Services Follow us on Facebook
Copyright © Universal Solutions All rights reserved. Privacy Policy. - Contact Us  Gulfoilandgas rss feed