Gulf Oil and Gas accountACCOUNT

Prosafe Wins Contract for Libya’s Bahr Essalam Phase II

Source: www.gulfoilandgas.com 11/29/2017, Location: Africa

Share |
Prosafe acting as commercial managers for the Axis Offshore owned Safe Swift has won a contract to support the TechnipFMC managed Bahr Essalam, Phase II development in the Central Mediterranean Sea.

The Safe Swift accommodating over 200 persons will operate gangway connected to the Sabratha platform, which is situated approximately 110km off the Libyan coast in a water depth of approximately 190m.

For more information about related Opportunities and Key Players visit North Africa Projects

Project & Resource Management News in Libya >>

Mauritania >>  10/12/2018 - KBR, Inc. announced that its UK operating subsidiary has been awarded a Front End Engineering Design (FEED) contract by BP for Phase 1 of the Tortue f...
Ghana >>  10/10/2018 - Subsea 7 S.A. announced the award of a contract by Tullow Ghana Limited on the Jubilee field, offshore Ghana, in water depths of up to 1000 meters. Th...

Egypt >>  10/8/2018 - WorleyParsons has been awarded a four years project management consultancy (PMC) contract for the new Assiut Hydrocracking Complex (AHC Project) in Eg...
Egypt >>  9/19/2018 - The Minister of Energy of Cyprus, Mr. George Lakkotrypis, and the Minister of Petroleum and Mineral Resources of Egypt, Eng. Tarek El Molla, signed an...

Related Categories: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Articles: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 


Libya Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 |

Oil & Gas Projects in Libya >>

More News

 

Oil & Gas Companies in Libya >>


Related Links

Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.