Gulf Oil and Gas accountACCOUNT

Unconventional Oil & Gas

Mexico Regulator Hopes for First Shale Auction by End 2018
Mexico hopes to hold its first shale oil and gas auction by the end of 2018, the head of the country’s oil regulator told Reuters, potentially opening up one of the world’s top reserves of unconventio...

Recent Unconventional Projects Updates

Tanjung Enim PSC
NuEnergy Gas Limited has received the coal bed methane (CBM) reserves certification from the Indonesia Research and Development Center for Oil and Gas Technology (LEMIGAS) for the Tanjung Enim (TE) PSC initial Plan of Development (POD) target development areas. The CBM reserves certification has confirmed 86.05Bscf for P1 and 78.84Bscf for P2 totalling ~165Bscf for the target development areas covering 33 km2 (or 13% of the TE PSC acreage). Once the POD is approved, CBM commercial development may commence for that specified resource.
Favorites  Development - Updated: 1/15/2018 - Field Development Project - ID
Block 61 - Khazzan and Makarem Gas Fields Development
Bp has awarded Jacobs Engineering Group Inc. an engineering, procurement and construction management (EPCM) contract for the Phase 2 of the Khazzan Project. Under the terms of the three-year contract, Jacobs will continue to deliver engineering, procurement and construction management (EPCM) services in support of the project, including the ongoing expansion of the gas gathering system, wellsite facilities and export pipelines.
Favorites  MainContract - Updated: 1/10/2018 - Field Development Project - OM
Block 61 - Khazzan and Makarem Gas Fields Development
Petrofac has been awarded a lump-sum contract worth approximately US$800 million by BP for the Phase 2 central processing facility (CPF) at the Khazzan Phase 2 (Ghazeer) gas development.
Favorites  MainContract - Updated: 12/12/2017 - Field Development Project - OM
Rengat CBM PSC
NuEnergy Gas Limited has completed the drilling program for two exploratory wells for the purpose of fulfilling the remaining Firm Commitment for the Rengat PSC.
NuEnergy also is now in the process of submitting the work completion report to the Indonesian Special Task Force for Upstream Oil and Gas Business Activities (commonly referred to as SKK Migas) to finalize and to confirm the completion of the Firm Commitment.
Favorites  Exploration - Updated: 11/30/2017 - Field Development Project - ID
Block 61 - Khazzan and Makarem Gas Fields Development
The first phase of development of Khazzan gas field was officially inaugurated. The Phase One development started gas production in September 2017, ten years after the signing of BP’s production sharing contract with Oman and almost four years after the development was approved.
Favorites  Development - Updated: 11/9/2017 - Field Development Project - OM
Area CN-V (Cuenca Neuquina V)
Rio Grande Oeste 1 exploration well was successfully tested 300 bopd gross. GeoPark constructed an early production facility to begin production in a long-term test during the Q4 of 2017.
Favorites  Exploration - Updated: 10/12/2017 - Field Development Project - AR
Tanjung Enim PSC
NuEnergy Gas Limited has executed a Memorandum Of Understanding (MOU) with PT Pertamina Gas to investigate the supply of coal bed methane (CBM) gas from Tanjung Enim PSC to Pertamina Gas for distribution to consumers in Sumatra.
Favorites  MainContract - Updated: 9/28/2017 - Field Development Project - ID
Turaif Shale Gas Project (System A)
Turaif Shale Gas Project (System A) is in the final stages and the mechanical completion will happen soon.
Favorites  Execution - Updated: 9/27/2017 - Field Development Project - SA
Block 61 - Khazzan and Makarem Gas Fields Development
BP starts production from giant Khazzan gas field ahead of schedule and under budget.
Favorites  Production - Updated: 9/25/2017 - Field Development Project - OM
Anze CBM Project
Greka Drilling has been awarded two new drilling contracts with PetroChina Huabei Oilfield in addition to the one currently in progress. These two drilling contracts are to be deployed in PetroChina's CBM (coal bed methane) Blocks - Fanzhuang and Anze and are estimated to have an aggregate value of at least US$2m. The contract for the Anze Block is for two years with a scope of at least 10 directional wells to be drilled on two multi well pads.
Favorites  SubContract - Updated: 8/16/2017 - Field Development Project - CN

Shale Gas

United States
United States
United States
United States
Canada
United States
United States
Canada
Canada
United States
United States
United States
United States
Shale Gas Projects »

Oil Shale

United States
United States
United States
United States
United States
Canada
United States
United States
Canada
Oil Shale Projects »

Oil Sands

Canada
Canada
Canada
Canada
Canada
Canada
Oil Sands Projects »

Tight Gas

United States
United States
United States
United States
Oman
Tight Gas Projecs »

CBM

South Africa
Tanzania
United States
United States
Canada
CBM Projects »

Key Players

More Companies »

Unconventional Oil Events

6-8 December 2016 - Kuwait
21-22 November 2016 - Jordan
9-10 May 2016 - Argentina
25-26 November 2015 - Bahrain
15-16 October 2015 - China
20-21 May 2015 - China
18-19 May 2015 - Argentina
22-24 April 2015 - China
11-12 March 2015 - Mexico
5- 6 November 2014 - United States

Unconventional Resources
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Privacy Policy.