Gulf Oil and Gas accountACCOUNT

Uganda - Drilling Project Update

Source: www.gulfoilandgas.com 5/14/2009, Location: Africa

Tower Resources plc is pleased to confirm that the MBU-125 drilling rig imported from Southern Sudan for the Iti-1 well is on site and is being rigged up.

The road conditions and procedures in Southern Sudan for exporting the rig and camp in three convoys have proven to be challenging but the challenge is being met. An additional two convoys containing the balance of the camp, drill pipe and other peripheral drilling equipment will be loaded and en route to the site early next week.

Tower now anticipates the commencement of drilling to be on or shortly after 25th May. A further announcement will be made once drilling begins.

Drilling News in Uganda >>

Brazil >>  4/18/2019 - Petrobras has completed the drilling of the well 3-SES-192 (Petrobras nomenclature) / 3-BRSA-1367-SES (ANP nomenclature)l in the area known as Moita B...
Brazil >>  4/17/2019 - Halliburton Company announced the execution of an integrated services contract with Royal Dutch Shell for post-salt development and pre-salt explorati...

United Kingdom >>  4/17/2019 - Hurricane Energy plc, the UK based oil and gas company focused on hydrocarbon resources in naturally fractured basement reservoirs, announces that the...
Australia >>  4/16/2019 - Central Petroleum Limited (Central) advises that the Operator (Santos) of EP112 Joint Operations has notified that the Dukas-1 well spudded at 7.45am ...

Australia >>  4/16/2019 - Senex Energy Ltd will start its Surat Basin natural gas drilling program next month after contracting experienced oil and gas services provider Easter...
Cameroon >>  4/16/2019 - Tower Resources plc, the AIM-listed oil and gas company with a focus on Africa, is pleased to provide an update on operations on the Thali block in Ca...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Uganda Oil & Gas 1 >>  2 | 3 |

More News

Related Links

AO BJ BW CD CG CI CM DZ EG EH ET GA GH GM GN GQ GW KE LR LY MA MG ML MR MZ NA NE NG RW SC SD SL SN SO ST SZ TD TN TZ UG ZA ZM
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.