Brookside Completed Maroons Well Drilling

Source: www.gulfoilandgas.com 4/18/2024, Location: Not categorized

Brookside Energy Limited ((Brookside or the Company) is pleased to provide shareholders and investors with an update on operations from the multi-well Flames-Maroons Development Plan (FMDP) in the core of the southern SCOOP Play in the Anadarko Basin (Figure 1).

Brookside is pleased to announce that drilling of the Maroons Well has been completed with the well reaching a total measured depth of ~12,665 feet. Drilling operations were conducted safely, on budget and on schedule. Casing is now being run in the lateral section of the well and is being cemented in place. Once the final casing string has been cemented in place the rig will be walked back to the Fleury Well to commence drilling of the intermediate section having previously drilled the surface hole.

The Maroons is the first horizontal well targeting the Sycamore within this specific drilling unit and will exploit a substantial reservoir already proven by offset vertical production. The Maroons lateral was successful in its objective to drill in a thick, productive Sycamore section within a structurally complex area. The brittle nature of the Sycamore in association with this structural complexity led to the Maroons encountering numerous fractures throughout the length of the lateral. Such fractures often function as pathways for oil and gas migration and production and help increase the Sycamore’s storage capacity. Further, drill cuttings along with continuous gas shows help illustrate the Maroons lateral placement in oil and gas prone reservoir rock.

About the Wells
The FMDP is a multi-well drilling program targeting the highly productive Sycamore and Woodford formations in the SCOOP area of the southern Anadarko Basin (Figure 2). Of the four wells in the multi-well drilling program, three are being drilled from the Sanford Pad; the Fleury, Maroons, and Iginla Wells. Once these well have been drilled and cased the drill rig will move to the Flames Well pad and drill the fourth well, the Rocket Well.

Figure 2: 3D image highlighting the “wine rack” style FMDP drilling program.

Authority:
This announcement has been authorised for release by the Board of Directors of Brookside Energy Limited


Namibia >>  5/23/2024 - Reconnaissance Energy Africa Ltd. (the "Company" or "ReconAfrica") announces an operations update with respect to activity relating to Petroleum Explo...
Nigeria >>  5/23/2024 - NNPC Ltd ,Schlumberger (SLB) Sign Agreement to Boost Upstream Operations …As Kyari Reiterates Company’s Resolve to Create Value for Nigeria

...


Norway >>  5/23/2024 - Equinor has made an oil discovery in well 25/11-H-1 H at the Svalin field in the North Sea. ...
Norway >>  5/23/2024 - The Norwegian Offshore Directorate has granted Aker BP ASA drilling permit for well 34/6-7 S in production licence 932, cf. Section 13 of the Resource...

Congo >>  5/21/2024 - First exploration success offshore DRC for three decades Muanda International Oil Company (“MIOC”), Perenco’s offshore DRC subsidiary, announces that...
United Kingdom >>  5/21/2024 - Odfjell Technology (UK) Limited are delighted to announce that Equinor (UK) Limited have exercised a 2-year option on the contract for the provision o...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.