Successful Heavy Lifts Performed At Tereos Starch & Sweeteners Europe Facility

Source: www.gulfoilandgas.com 4/15/2024, Location: Europe

In a remarkable feat of engineering and coordination, Sarens lifted an evaporator and separator along with several smaller pieces necessary for the facility's operations at the Tereos Starch & Sweeteners Europe facility in Aalst, Belgium. The lifts were completed within a tight timeframe and challenging conditions. The project, which involved maneuvering heavy equipment in a small area in the center of the city, required meticulous planning and execution.

The congested site, coupled with the bustling urban environment, necessitated coordination with local authorities, including the police, to ensure minimal disruption to the surrounding area. Moreover, wind restrictions added an extra layer of complexity, requiring constant monitoring and adjustment to ensure the safety of the operation.

The heaviest piece of equipment, weighing 150 T and to be lifted to a height of over 50 meters high, posed a significant challenge. To maneuver such massive components within the confined space, Sarens decided to move one AC700 crane equipped with a luffing jib from our France department, another 450 T from the Netherlands, and a second AC700 cranes also equipped with a luffing jib. Complementing these were mobile cranes including a LTM1100, and LTM1110, each carefully selected to meet the demands of the task at hand.

The equipment was rigged using more than 20 transports. The mobilisation and demobilisation of equipment took around two days each. Additionally, the installation of the luffer jibs proved challenging due to the limited space, requiring precise engineering skills and careful coordination.

The transportation of the evaporator and separator, along with the smaller pieces, was facilitated by vessels, particularly navigating through small canals to reach the destination safely.

With the assistance of a skilled crew comprising more than 10 members, the lifts were completed in two days, causing minimum disruption to the people in the neighborhood.

According to Project Manager, Luc De Meester, “Even though there were challenges, the customer was happy with how well the project was done. This clearly demonstrates the professionalism and expert skills of our team. Congratulations to all!”


United States >>  6/13/2024 - Danfoss Drives is pleased to announce that we have signed a non-binding memorandum of understanding (MoU) with Honeywell to explore a possible collabo...
Canada >>  6/11/2024 - Westinghouse Electric Company today announced the launch of a new global engineering hub in Kitchener, Ontario. The 13,000-square-foot office opening ...

Oman >>  6/6/2024 - The Public Establishment for Industrial Estates “Madayn", represented by the Industrial Innovation Academy, has signed a cooperation agreement with th...
United States >>  6/5/2024 - Seatrium has been awarded a Letter of Intent (LOI) by BP Exploration & Production Inc. to provide services to carry out certain early engineering work...

Canada >>  5/30/2024 - AtkinsRéalis Group Inc., a fully integrated professional services and project management company with offices around the world, announced today that w...
United States >>  5/30/2024 - Ocean Power Technologies, Inc. (“OPT” or the “Company”), a leader in innovative and cost-effective low-carbon marine power, data, and service solution...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.