Annual Outage of Olkiluoto 1 Extended Due to Fault Detected in Generator

Source: www.gulfoilandgas.com 5/25/2024, Location: Europe

The annual outage of Olkiluoto 1 is expected to conclude on June 16th according to the revised schedule.

The extension is due to a fault detected in the generator during the maintenance. Detailed investigations and repair plans for the fault have been initiated immediately. The generator converts the turbine's kinetic energy into electricity.

The annual outage of OL1 began on May 12th. Olkiluoto 2 and Olkiluoto 3, which have already completed their maintenance, are producing electricity normally. Currently, they are generating electricity at a capacity of approximately 2,460 MW.


United Kingdom >>  12/4/2024 - Centrica plc (the "Company") is pleased to announce the extension of the lives of its four operational Advanced Gas-cooled Reactor ("AGR") nuclear pow...
United States >>  12/4/2024 - NANO Nuclear Energy Inc. (NASDAQ: NNE) (“NANO Nuclear” or “the Company”), a leading vertically integrated advanced nuclear technology company developi...

United States >>  12/4/2024 - Westinghouse Electric Company announced today that the U.S. Nuclear Regulatory Commission (NRC) approved the state-of-the-art eVinci™ Advanced Logic S...
United States >>  12/3/2024 - Ad Astra Rocket Company (Ad Astra) and The Space Nuclear Power Corporation (SpaceNukes) have signed a strategic partnership to advance high-power Nucl...

Canada >>  12/2/2024 - Bruce Power has signed a 10-year extension to a Master Service Agreement (MSA) with Kinectrics Inc. in support of continued excellence in its operatio...
United States >>  12/2/2024 - New and advanced nuclear reactor technologies – including small modular reactors, or SMRs – and their associated fuel cycles represent growing opportu...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.