Allseas Announces Fast-Track Caribbean Pipeline
Source: www.gulfoilandgas.com 6/20/2024, Location: South America
Lorelay will head to the Caribbean at the end of the year to install a platform-to-platform off the east coast of Trinidad.
Installation of the 22-kilometre, 16-inch diameter line is planned for November, and the contract award once again reinforces Allseas’ ability to take on complex pipelay projects with fast-track planning and execution scopes.
Running at a water depth of 60-70 metres, the pipeline will tie back from a new installation to an existing installation. The scope includes mattress installation and pre- and post-lay survey.