Equinor Strengthens its Position in the Norwegian Sea

Source: www.gulfoilandgas.com 11/7/2024, Location: Europe

Equinor has signed an agreement to acquire Sval Energi’s 11.8% share in the Halten East Unit. With this acquisition, Equinor increases its ownership to 69.5%.

Halten East is an ongoing offshore development located in the Kristin-Asgard area in the Norwegian Sea. The development comprises six gas discoveries and three prospects, which will utilise existing infrastructure and processing capacity at Åsgård B.

The recoverable reserves in Halten East are estimated to be around 100 million barrels of oil equivalents, of which approximately 60% is gas that will be exported to Europe via Karsto.

“Halten East is an important project with strong profitability and low emissions, in a core area for Equinor. The transaction is in line with our strategy of optimising our portfolio on the Norwegian continental shelf to ensure long-term value creation,” says Grete Birgitte Haaland, senior vice president for Exploration and Production North.

The development will be carried out in two phases, with the drilling of six wells for five discoveries in the first phase (2024-25). The second phase (2029) includes a sidetract to one discovery and three optional wells for the prospects. The Halten East Unit was approved in May 2022 and is on track to start production next year.

The transaction is subject to various regulatory approvals. The effective date of the transaction is 1 January 2024.

Halten East
- Halten East consists of the Gamma, Harepus, Flyndretind, Nona, Sigrid and Natalia discoveries.
- Halten East is a subsea development tied back to the Åsgard facilities and includes the installation of three subsea templates in the south, and two subsea templates in the north.
- A total of up to ten wells are planned to be drilled.
- The southern structures will be tied in to a 49-kilometre pipeline from Mikkel South to Asgard subsea compressor manifold station (SCMS)
- The northern structure will be tied into a 22-kilometre pipeline from Natalia to SCMS.
- Gas and oil/condensate are sent to Asgard B for processing, and oil and condensate are stored in Asgard C for export by tankers.
- Produced gas is sent through the Asgard Transport gas pipeline to Karsto, and from there to Europe


Trinidad and Tobago >>  12/13/2024 - Touchstone Exploration Inc. ("Touchstone", "we", "our" or the "Company") is pleased to announce that its wholly owned subsidiary, Touchstone Explorati...
Norway >>  12/12/2024 - Next Geosolutions Europe Spa, following up on its growth strategies communicated at the time of listing, announced Tuesday the expansion of its offsho...

United Kingdom >>  12/12/2024 - Highlights
· Agreement of commercial terms for the sale of a 50% interest in Earlham and Orwell to MLCP and a carry arrangement to bring Ear...

Colombia >>  12/11/2024 - Parex Resources Inc. (“Parex” or the “Company”) and its strategic partner Ecopetrol S.A. (“Ecopetrol”), are pleased to announce that they have execute...

India >>  12/11/2024 - ReNew Energy Global Plc (“ReNew” or the “Company”) (NASDAQ: RNW, RNWWW) today announced that it has received a non-binding proposal dated December 10,...
United Kingdom >>  12/11/2024 - HydrogenOne today announces that its investment adviser HydrogenOne Capital LLP (the "Investment Adviser") has entered into a conditional agreement to...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.