Borr Drilling Limited - Temporary Suspension Notice
Source: www.gulfoilandgas.com 11/19/2024, Location: South America
Borr Drilling Limited (the "Company") (NYSE: BORR) (OSE: BORR) has received a notice of temporary suspension of operation for its rig "Arabia II", operating in Saudi Arabia. The temporary suspension will be for a period of up to 12 months. The commencement date of the suspension is still to be confirmed by the customer.