Interoil Provides Production update October 2024

Source: www.gulfoilandgas.com 11/28/2024, Location: South America

Production Summary
Daily Average Production: Interoil’s total operated production in October averaged 2,239 boepd, reflecting a month-on-month improvement of +157 boepd.
The increase was primarily driven by operations in Argentina (+196 boepd), while Colombia experienced a decline of -39 boepd.

Country-Specific Highlights

Argentina
Following the recovery of pre-winter production levels, field teams concentrated on restoring and maintaining compression and generation equipment across multiple sites.
These efforts successfully reactivated additional wells that had been shut in during the winter, contributing significantly to the overall production increase.

Colombia
Production for October was limited to the Puli C operation, as the Vikingo Field remained shut in throughout the month due to downhole equipment failure.
Vikingo-1 Intervention: A downhole intervention during November resulted in an initial production rate of approximately 400 bopd. The current production is 300bopd, a significant increase from the pre-intervention level of 105 bopd.
Next Steps: The workover rig is being mobilized from the Vikingo site to the Puli C fields and is expected to arrive by the end of the month.
The Puli C well intervention is projected to span at least three months, with the goal of increasing production by replacing downhole production equipment.


China >>  1/20/2025 - CNOOC Limited (the “Company”, SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) today announces that Dongfang 29-1 Gas Field Development...
Libya >>  1/19/2025 - The Chairman and Board of Directors of the National Oil Corporation (NOC) have praised the Arabian Gulf Oil Company (AGOCO) for reaching a significant...

Colombia >>  1/17/2025 - GeoPark Limited (“GeoPark”) (NYSE: GPRK), a leading independent energy company with over 20 years of successful operations across Latin America, annou...
Gabon >>  1/17/2025 - BW Energy will publish financial figures for Q4 2024 on Friday, 31 January 2025. The full audited annual report will be published on 26 February 2025...

Mongolia >>  1/16/2025 - Petro Matad Limited (AIM: MATD), the AIM quoted Mongolian oil company, provides the following update on production operations at the Heron-1 well in i...
United Kingdom >>  1/16/2025 - - Production from the Saltfleetby Field in the Fourth Quarter of 2024 was 517 million standard cubic feet of natural gas and 9,387 barrels of gas c...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.