Salamander Provides Operations Update in Thailand

Source: www.gulfoilandgas.com 3/31/2010, Location: Asia

Salamander Energy plc, the Asia-focussed independent oil and gas exploration and production company, announces the start of Phase IV of development drilling on the Bualuang oil field, Block B8/38, offshore Gulf of Thailand.

The jack up rig, Emerald Driller, arrived on location at the Bualuang field on 26 March 2010 for a drilling programme that will see the existing slant production wells (BA-2, -03 and -04) turned into horizontal production wells. The first of these, the (BA-03H) well, has now commenced operations.

The wells will have 600 to 850 metre horizontal sections and be installed with expandable sand screens and electro submersible pump completions. It is estimated that the wells will be completed and tied-in within six weeks.

Further drilling is planned on the B8/38 licence in Q4 2010 to include Phase V of the Bualuang field development and step-out exploration wells on the Eastern Terrace and North Bualuang prospects.


Tunisia >>  6/24/2022 - Zenith Energy Ltd. (ZENA) provides an update on operational activities in the Robbana concession ("Robbana"), located onshore Tunisia. ...
Oman >>  6/23/2022 - Technology-driven oil exploration and production business Rex International Holding Limited ("Rex International Holding," "Rex," or the "Company," and...

South Africa >>  6/22/2022 - An update on the activities for its planned Gazania-1 Well, offshore South Africa, is provided by Eco (Atlantic) Oil & Gas Ltd., an oil and gas explor...
Egypt >>  6/21/2022 - United Oil & Gas Plc ("UOG"), the growing oil and gas company with a portfolio of production, development, exploration and appraisal assets is please...

Namibia >>  6/21/2022 - The Ministry of Mines and Energy in Namibia has approved an extension to the First Renewal Exploration Period for Petroleum Exploration License 83 ("P...
Norway >>  6/21/2022 - The drilling of wildcat well 34/9-1 by Equinor Energy AS, the operator of production licence 1049, has been completed.

The well was drilled...


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.