Roxi Provides Operational Update on Ravninnoe

Source: www.gulfoilandgas.com 5/10/2010, Location: Asia

Roxi Petroleum, the Central Asian Oil and Gas Company with a focus on Kazakhstan, announces the following operational update on Ravninnoe: Well 20 ready for 90 day production test and acidisation.

Ravninnoe (Roxi Interest 30%)
The work-over rig has been released and demobilised from Well 20, and the well prepared and connected up to production facilities for 90 day production testing and acid stimulation, scheduled to begin during May 2010.

Well 20 was drilled during November and December 2009 and perforated over a cumulative 18 metre interval of Middle Carboniferous dolomitic carbonates on 26 March 2010. The well flowed at initial rates of 240 barrels of dry oil per day.


India >>  5/10/2021 - Technip Energies (TE) has been awarded a large Engineering, Procurement, Construction and Commissioning (EPCC) contract by Indian Oil Corporation Limi...
Russia >>  4/28/2021 -  PAO NOVATEK (“NOVATEK”) announced that its joint venture OOO Arctic LNG 2 (“Arctic LNG 2”) concluded 20-year LNG Sales and Purchase Agreements (SPAs)...

India >>  4/26/2021 - - EPCC contract awarded by Indian Oil Corporation Limited for the implementation of a new Para-Xylene plant in Paradip, in the state of Odisha, in Eas...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.