Desire Provides Update 14/15-1Z Sidetrack Well

Source: www.gulfoilandgas.com 11/1/2010, Location: South America

Desire Petroleum plc, the oil and gas company wholly focussed on the North Falkland Basin, provided an operational update on the 14/15-1Z sidetrack well on the Rachel prospect.

Due to wellbore stability issues through the deviated section of the wellbore (forty degree hole inclination) it was not possible to reach the target depths in the first wireline logging run. The hole is now being cleaned out prior to making a further attempt.


Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.