Completion of Drilling Operations of Shaikan-3 Well

Source: www.gulfoilandgas.com 1/5/2011, Location: Middle East

Gulf Keystone announces the completion of drilling and testing operations on its Shaikan-3 shallow appraisal well. This well was designed to drill and test the Cretaceous intervals in the immediate vicinity of the Shaikan-1 discovery well. The Company has a 75 percent working interest in the Block and is partnered with the MOL subsidiary, Kalegran, and Texas Keystone, which have the remaining 20 and 5 percent working interests respectively.

The well drilled the entire Cretaceous interval and on into the Jurassic Sargelu formation. A total of two open hole and two cased hole flow tests were conducted in the Cretaceous. As a result of these tests, log evaluations and recovered fluid samples, the Company's current P50 to P10 estimate of Garagu oil in place volumes is 220 million to 2.2 billion barrels. These Garagu resources are in the lower portion of the Cretaceous (between 1060m and 1157m). The Shaikan partner group will formulate a development plan for these resources.

The large spread between P50 and P10 volumes is due to the uncertainty with respect to the exact nature of the Cretaceous down dip, on the flanks of the Shaikan structure. If the Cretaceous is oil bearing near the flanks, then the P10 volumes become more likely and it is possible that the oil will also be less viscous and of higher API gravity.

In the mean time, due to the different characteristics of the Cretaceous oil, the Shaikan-3 well has been completed as a second Jurassic producer from the Sargelu formation and will flow into the same test facilities as the Shaikan-1 well.

John Gerstenlauer, Gulf Keystone's Chief Operating Officer commented "The Cretaceous resources evaluated by the Shaikan-3 well are massive by any standard. They represent a significant oil resource for Kurdistan and Iraq. It is a further demonstration of the huge hydrocarbon potential of the area."


Australia >>  7/5/2022 - The Palm Valley 12 (PV12) well in OL3, southwest of Alice Springs in the Northern Territory, was at a depth of 2,335m in the P4 unit of the Pacoota Fo...
Brazil >>  7/5/2022 - A 540-day drilling contract with a start date of 2023 has been given to Valaris, represented by Ensco UK Drilling Limited and Ensco do Brasil Petróleo...

Canada >>  7/5/2022 - The Mobile Offshore Drilling Unit (MODU) Stena ICEMAX has a new contract with BP Canada Energy Group ULC, which Stena Drilling is happy to announce....
Indonesia >>  7/5/2022 - The second of the company's two back-to-back producing wells is where drilling activities have started, according to Indonesia Energy Corporation Limi...

Norway >>  7/4/2022 - The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy Norge AS drilling permit for well 35/6-3 S, cf. Section 13 of the Resource Manage...
Norway >>  7/4/2022 - The Norwegian Petroleum Directorate (NPD) has granted OMV (Norge) AS drilling permit for well 30/5-4 S, cf. Section 13 of the Resource Management Regu...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.