Gulf Oil and Gas accountACCOUNT

Extended scope contract secures fire protection

Source: www.gulfoilandgas.com 1/9/2011, Location: Europe

The gas main serves the annealing and pickling plant at the site, where, following a fire, an investigation by Safety, Health and Environmental Services recommended improvements. These involved the installation of five new actuated butterfly valves on the gas main for emergency shutdown duty and the motorisation of one existing hand operated valve. The new system is designed to close down the gas main serving three buildings within two minutes.

Following an initial survey, Rotork’s Site Service Department proposed a turnkey solution encompassing the design, procurement, installation and commissioning of all the elements required for the new system. This included the provision of IQT Pro intelligent electric actuators with integral partial valve stroking software, facilitating function testing of the system without any interruption to normal operations.

In addition to installing the new actuated butterfly valves and retrofitting the existing valve, Rotork has been responsible for many pipework modifications and the design and installation of a distributed control system with an uninterruptable power supply, comprising shut down panels for each of the three buildings and a shutdown panel for the entire system in the site’s central security centre.

Rotork’s successful completion of the contract has been achieved with the assistance of the Royal Mint’s local sub-contractors including JRP Electrical and the Systems Group.

Fire Protection & Suppressing Equipment >>

Fire Protection & Suppressing Equipment News in United Kingdom >>

Norway >>  12/12/2019 - Subsea 7 announced the award of a sizeable contract by Aker BP for the AErfugl Phase 2 gas field development, located approximately 210km west of Sand...
Norway >>  12/12/2019 - Kvaerner also announced a new agreement with Samsung Heavy Industries and Aker Solutions, for joint delivery of upcoming FPSO contracts. The partners ...

United Kingdom >>  12/12/2019 - Petrofac has secured two new Framework Agreements (FAs) for the provision of Engineering, Procurement, Construction and Commissioning (EPCC) services....
United Kingdom >>  12/11/2019 - Maersk Drilling has signed agreements with Halliburton and Petrofac to collaborate on the exploration programme to be delivered under Maersk Drilling’...

Poland >>  12/3/2019 - Fluor Corporation (FLR) announced that it was awarded a services agreement by PKN ORLEN to provide project management contractor (PMC+) services for t...
Denmark >>  11/25/2019 - Total E&P Danmark A/S has awarded Emerson a contract to provide wellhead pressure monitoring technology to enhance safety during the multi-year redeve...

Related Categories: Fire Fighting Houses  Fire Fighting Vehicles & trucks  Fire Protection & Suppressing Equipment  Gas Detection equipment  General  Life Saving Equipment at sea  Portable Extinguishers  Pressure Relief & Rupture Devices  Safety Equipment/Supplies  Security Control Equipment  Spill Control Equipment  Surveillance Equipment  Tubular Inspection Equipment 

Related Articles: Fire Fighting Houses  Fire Fighting Vehicles & trucks  Fire Protection & Suppressing Equipment  Gas Detection equipment  General  Life Saving Equipment at sea  Pressure Relief & Rupture Devices  Safety Equipment/Supplies  Security Control Equipment  Spill Control Equipment  Surveillance Equipment  Tubular Inspection Equipment 


United Kingdom Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |

More News

Related Links

00 AL AT BE BG CH CY CZ DE DK ES FI FR GR HR HU IE IT NL NO PL PT RO SE SI TR UK
Gulf Oil and Gas
Copyright © 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.