Total Launches Phase 1 of Moho-Bilondo Project

Source: www.gulfoilandgas.com 8/30/2005, Location: Africa

Total (operator, 53.5%) has received the green light by the Congolese authorities to begin developing the Moho-Bilondo project, located around 80 kilometers offshore in water depths ranging from 600 to 900 meters. Phase 1 of the Moho-Bilondo development comprises 12 subsea wells-seven producers and five water injectors-tied into a Floating Production Unit (FPU) housing the processing facilities. Expected to peak at 90,000 b/d, production will be exported to the Djéno terminal, which already handles nearly all of the country’s crude oil output.14 The development is scheduled to come on stream in 2008.

Total E&P Congo’s (53.5%) partners in the Moho-Bilondo permit are Chevron Congo Overseas Ltd. (31.5%) and the Société Nationale des Pétroles du Congo (15%). The percentages indicated take into account the recent acquisition by Total E&P Congo of a 2.5% interest in the Haute-Mer permit that had been previously held by Energy Africa (subsidiary of Tullow Oil).

Total is the country’s biggest foreign investor and leading oil producer, operating around 57% of output. In 2004, Total produced 813,000 barrels of oil equivalent per day in Africa, its primary hydrocarbon production. The Congo accounted for 91,000 barrels.


United States >>  12/3/2024 - Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF), the Rocky Mountain oil and gas company focused on responsible resource development from carbon-neutral o...
Mongolia >>  12/2/2024 - ? Production from the three new pilot wells (LF-04, LF-05 and LF-06) has commenced with all new wells commissioned over the weekend
? All six pi...


Libya >>  11/30/2024 - Oil fields are operating continuously, with production figures showing steady growth in crude oil output. Over the past 24 hours, crude oil and conden...
China >>  11/29/2024 -  China Petroleum Network News (Reporter Wang Shanshan, Special Correspondent An Ning, Xie Jun) On November 25, Jilin region encountered snowfall and ...

Colombia >>  11/29/2024 - Highlights in the period
Interoil’s total operated production for the first nine months of 2024 was 551,140 barrels of oil equivalent (boe), a ...

Colombia >>  11/28/2024 - Production Summary
Daily Average Production: Interoil’s total operated production in October averaged 2,239 boepd, reflecting a month-on-month ...


Related Categories: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Unskilled Labors  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 

Related Articles: Camp Building  Cleaning Equipment, Services  Communication  Corrosion Products/Services  Development  Exploration  Food Supplies  General  Labor Services  Land & Leasing  Mine Clearance  Oil & Gas Companies  Production  Service Companies  Skilled Labors  Transportation, 4X4 Trucks  Utility Systems  Waste Disposal  Water Supply Services  Welding Products/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.