Gulf Oil and Gas accountACCOUNT

Gazprom Neft Starts Drilling in Orenburg Field

Source: www.gulfoilandgas.com 11/29/2011, Location: Asia

Gazprom Neft is launching its production programme in the Eastern part of the Orenburg oil and gas condensate field, where the company took control in October 2011. The new owner, Gazprom Neft, is drilling its first operating oil wells within its own investment programme.

The first stage of the programme starts with a pilot project involving the drilling of six wells. The completion of drilling the first horizontal well is scheduled for March 2012. This will extend 2,400 metres, and by the end of the year construction will have started on two further horizontal operating wells.

The pilot project will allow Gazprom Neft to start work in new parts of the field that are not yet in production. The results will help clarify the geology of previously uninvestigated areas and determine the potential of new wells, making it possible to draw up plans and take the technical decisions necessary to move on to full production in the new areas. The overall 2012 production programme will be adjusted in line with the results of the pilot project.

“Working efficiently to develop future production plans for this new asset will allow Gazprom Neft to meet the challenge, which is to create a new production area for the company in Orenburg region and triple current output to around 5 million tonnes of oil equivalent annually within five years,” said Vadim Yakovlev Gazprom Neft First Deputy CEO.

Drilling News in Russia >>

Brazil >>  4/17/2019 - Halliburton Company announced the execution of an integrated services contract with Royal Dutch Shell for post-salt development and pre-salt explorati...
United Kingdom >>  4/17/2019 - Hurricane Energy plc, the UK based oil and gas company focused on hydrocarbon resources in naturally fractured basement reservoirs, announces that the...

Australia >>  4/16/2019 - Central Petroleum Limited (Central) advises that the Operator (Santos) of EP112 Joint Operations has notified that the Dukas-1 well spudded at 7.45am ...
Australia >>  4/16/2019 - Senex Energy Ltd will start its Surat Basin natural gas drilling program next month after contracting experienced oil and gas services provider Easter...

Cameroon >>  4/16/2019 - Tower Resources plc, the AIM-listed oil and gas company with a focus on Africa, is pleased to provide an update on operations on the Thali block in Ca...
Norway >>  4/16/2019 - The Norwegian Petroleum Directorate has granted Aker BP ASA a drilling permit for well 25/11-29 S, cf. Section 15 of the Resource Management Regulatio...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 |

Oil & Gas Projects in Russia >>

More News

Related Links

AZ BD BN CN GE HK ID IN IR JP KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.